flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA renovates Rowing Center at Cornell University

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.


By By BD+C Staff | December 19, 2011
The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower roo

The Cornell University Rowing teams have been on a winning streak recently. Since 2006, the men’s lightweight crew has won threeIRA (Intercollegiate Rowing Association) national championship crowns while the men’s heavyweight and women’s teams have medaled at national regattas and continued to improve their competitive standing.

Now the teams have an expanded Rowing Center to match their athletic gains.

Designed by HGA Architects and Engineers (HGA), Cornell’s updated Rowing Center overlooking Lake Cayuga in Ithaca, N.Y, repositions two existing boathouses into an advanced training facility that competes with the best in the nation.

Cornell’s crews include approximately 150 athletes on three teams—Men’s Heavyweight, Men’s Lightweight, and Women’s. The rowing facility had consisted of the two-story, 15,000-square-foot Collyer Boathouse built in 1957 for the men’s teams, and the adjacent one-story, 5,000-square-foot Robison Boathouse built in 1979 for the women’s team.

While serving their purpose well over the years, the boathouses lacked the infrastructure to fully support the growing teams—especially compared to newer facilities by competitors. The women’s crew, for instance, had tripled since it became a varsity team in the 1970s, yet the locker rooms were one-third the size of the men’s. In addition, neither building had adequate boat storage or indoor training equipment, with the crews splitting training between the Cayuga Inlet and Teagle Hall Fitness Center.

Cornell conducted an earlier study that recommended razing the boathouses for a new facility. However, when funding sources weren't adequate for this plan, the college cut back and looked for other options. Working with HGA, Cornell was able to arrive at a solution that fit the needs of the school, the athletic department, and the crews.

The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower rooms,  laundry facility, a Tradition Room displaying crew memorabilia, and meeting spaces. It is connected to the Collyer Boathouse via a two-story entrance lobby with a second-floor bridge. An outdoor gathering space connects to the lobby.

Collyer’s second-floor has been converted to a multi-purpose training room with state-of-the-art exercise equipment and weightlifting stations. The first level houses boat storage, waterfront offices for coaches, a water safety room, and repair bay.

Robison Boathouse, meanwhile, was cleared of its outdated locker room and offices and now functions solely as rowing shell and equipment storage. Doors were added to the backside of both original buildings to allow the teams to load shell trailers for event travel from the parking lot. The new door at Collyer even allows the teams to pull a loaded trailer into the boat bay in December to streamline departures for winter training. A new launch storage building completes the set of three structures.

Throughout Collyer and the addition, large windows overlook the water and oversized graphics and bold red accents emphasize Big Red traditions. The locker rooms include off-the-shelf resin lockers customized with integral venting and on-demand heating to allow the staff to dry damp rowing gear overnight and exhaust odors fully within the locker.

Exterior upgrades work within the existing buildings’ style and massing. HGA replaced wooden doors with glass doors to open the interior to views of the water, replaced and reconfigured upper windows, repaired stonework, and added metal standing-seam roofs over the three structures to architecturally unify them and provide durable performance over the long term. The crisp existing color palette of nautical white paint, local bluestone accent panels and Cornell Red trim was restored and extended to the addition.

The site itself presented structural challenges due to the soft load-bearing soil conditions. With marginal soil-bearing capacity and bedrock far below affordable levels to reach with piers, HGA's team designed a system that pre-loaded the site to force settlement before pouring a three-foot-thick concrete-slab mat foundation for the addition. New structural framing for the addition cantilevers toward Collyer without actually bearing on the existing structure.

And while Collyer was structurally sound, HGA reinforced the joists on the second level to support increased capacity for the weight-lifting stations.

The project provides significant savings for the Athletic Department through a number of sustainable features, including an upgraded exterior envelope with added insulation and thermal-pane windows, energy-efficient fixtures, room occupancy sensors, lighting control systems, and an air-to-air heat exchanger to temper the high fresh air loads. In addition, the tight site integrates native plantings and pervious pavement to treat surface storm water and creates a right-of-way for the Cayuga Waterfront Trail, a public bike/pedestrian path.

Since its dedication this summer, the Rowing Center has proved a winner on all counts. The Athletic Department has a cost-efficient facility that provides effective training and team support, adds much-needed boat storage, upholds the University’s gender equity standards, preserves the heritage of the existing structures, and provides an outstanding environment for recruiting and alumni events.

HGA directed architecture, interior, structural, mechanical and electrical services. HGA’s project team included d’Andre Willis, AIA, principal and project manager; Loren Ahles, FAIA, project lead designer; Kendra Beaubien, AIA, project architect; Kevin Allebach, RA, project architect; Amy Tasch, LEED AP, interior designer; Sarah Jorczak, PE, structural engineer; Lance Kempf, PE, mechanical engineer; and Ben Gutierrez, electrical. The team also included Welliver McGuire, Inc., general contractor; CHA, civil engineer; and CHA, landscape architect. BD+C

Related Stories

| Aug 11, 2010

SAFTI FIRST hires Tim Nass as National Sales Manager

SAFTI FIRST, a leading USA manufacturer of fire rated glazing and framing systems, is pleased to announce the addition of Tim Nass as National Sales Manager.  In his new role, Tim will be working closely with architects and contract glaziers in selecting the appropriate and most economical fire rated glazing solution for their project.   He will also be coordinating SAFTI FIRST’s extensive network of architectural representatives throughout the United States.

| Aug 11, 2010

NCARB welcomes new board of directors

The National Council of Architectural Registration Boards (NCARB) introduces its Board of Directors for FY10, who were installed during the culmination of the Council’s 90th Annual Meeting and Conference in Chicago.

| Aug 11, 2010

Berkebile wins $100K award for commitment to environment

Robert Berkebile, the founding principal of BNIM Architects and a founding member of the U.S. Green Building Council, has been selected to receive a $100,000 Heinz Award. The award honors his role in promoting green building design and for his commitment and action toward restoring social, economic, and environmental vitality to America’s communities through sustainable architecture and planning.

| Aug 11, 2010

Polshek Partnership unveils design for University of North Texas business building

New York-based architect Polshek Partnership today unveiled its design scheme for the $70 million Business Leadership Building at the University of North Texas in Denton. Designed to provide UNT’s 5,400-plus business majors the highest level of academic instruction and professional training, the 180,000-sf facility will include an open atrium, an internet café, and numerous study and tutoring rooms—all designed to help develop a spirit of collaboration and team-oriented focus.

| Aug 11, 2010

University of Florida aiming for nation’s first LEED Platinum parking garage

If all goes as planned, the University of Florida’s new $20 million Southwest Parking Garage Complex in Gainesville will soon become the first parking facility in the country to earn LEED Platinum status. Designed by the Boca Raton office of PGAL to meet criteria for the highest LEED certification category, the garage complex includes a six-level, 313,000-sf parking garage (927 spaces) and an attached, 10,000-sf, two-story transportation and parking services office building.

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

Callison, MulvannyG2 among nation's largest retail design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 Retail Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021