flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

The project for Cell Signaling Technology will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.


By Novid Parsi, Contributing Editor  | April 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus for Cell Signaling Technology (CST). Rendering courtesy HGA
Rendering courtesy HGA

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. 

The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables. The building’s heating, cooling, and hot water will be sourced from geothermal energy. The sustainable campus will target LEED, LEED Zero Carbon, and WELL certifications.

“This is an architect’s dream—to marry our design thinking and holistic approach with CST’s project aspirations while transforming an abandoned quarry into a new campus for life sciences research,” Samir Srouji, principal with HGA, said in a statement.

To support everyday life and employee wellbeing, the design includes a Quarry Garden and Upper Quad designed by landscape architects Studio 2112. These outdoor spaces will connect to a network of trails around the site. A primary circulation route will direct activity from the cloistered Upper Quad, the heart of the campus, to the Quarry Garden, located at the cliff’s base.

The project prioritizes low embodied carbon and healthier materials. Proposed materials include a natural granite base with brick cladding, curtain wall technology with vacuum-insulated glazing, and mass timber structure for the multipurpose lobby pavilion. To foster a thriving natural ecosystem, the project includes native plantings, resilient stormwater management, and a woodland environment.

Sightlines will extend throughout the building, providing natural light and an unobstructed view of the surrounding landscape and the scientists at work. In the flexible open lab environment, robust mechanical, electrical, and plumbing systems will enable the facility to adapt to new technology and instruments in the future.

On the Building Team:
Owner: Cell Signaling Technology
Design architect and architect of record: HGA
MEP and structural engineer: BR+A
General contractor: Columbia

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus for Cell Signaling Technology (CST). Rendering courtesy HGA
Rendering courtesy HGA
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus for Cell Signaling Technology (CST). Rendering courtesy HGA
Rendering courtesy HGA

Related Stories

Laboratories | Jun 24, 2020

CDC set to build the most advanced high containment laboratory in the country

Flad Architects, Page Southerland Page, and WSP will plan, program, and design the HCCL.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

Laboratories | May 21, 2019

Georgia Tech Research Institute adds 350,000 sf of specialized tech facilities

McCarthy Building Companies with Flad Architects acted as the design-build team.

Laboratories | Apr 23, 2019

Translational health science environments: 6 strategies for open innovation and knowledge transfer

Simply putting researchers and clinicians in the same building with hopes that serendipitous collaborations will ensue will often not yield the outcomes organizations seek.

Sustainable Design and Construction | Apr 9, 2019

One of the largest zero-carbon, net-zero buildings is rising in Spokane

Catalyst will be part of an innovation hub, with Eastern Washington University as its main tenant.

Laboratories | Apr 1, 2019

The Karolinska Institute’s new laboratory building

C.F. Møller Architects designed the building.

| Mar 21, 2019

Preserving Edison's "Corporate" R&D Lab in West Orange, N.J.

Report on Thomas Edison's West Orange, N.J., Laboratory.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021