Rising 24 stories in the center of downtown San Diego, the San Diego Central Courthouse, with its subtractive massing and slender form, topped with a dramatic aluminum-panel crown structure, makes a bold architectural statement about the future of civic buildings in America’s Finest City.
The 704,000-sf facility, on a former brownfield site at the intersection of Union and C Streets, is designed to serve as a catalyst for an emerging government district. It consolidates 71 departments across San Diego County’s criminal trial, family, and civil courts in a 21-story tower that sprouts from a three-story podium structure.
The high-volume functions of the criminal courts—arraignment courts, misdemeanor courts, offices, jury assembly rooms, business offices, cafeteria—are located within the podium. These functions are serviced by a cascading stair and escalator along a three-story lobby, which connects with a vestibule and a raised entry plaza. A fritted glass curtain wall brings natural light into the corridor.
The courthouse is crowned with a distinctive canopy and soffit of shaped aluminum panels, which are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. Bruce Damonte, courtesy SOM.
In the tower, the plan is organized based on a module of two pairs of courtrooms with a holding core in between. Clear and separate circulation paths are provided for the public and staff.
The courthouse connects via bridge to the adjacent Hall of Justice, at the third level. The bridge is accessible by escalator from the lobby and is adjacent to the new 500-person jury assembly room, permitting members of the public who have passed through security in either building to pass between buildings, and allowing the jury assembly room to serve both buildings.
The high-volume functions of the criminal courts are located within the podium and are serviced by a cascading stair and escalator along a three-story lobby. Bruce Damonte, courtesy SOM.
Working with the client, the project team delivered on several key owner objectives, including:
— Flexible, adaptable spaces. The client desired a building that could easily adapt to meet future needs. For example, the design of the family, probate, and civil courts is identical to the criminal trial courts, with the exception of the jury box. This allows the criminal courts to be converted to family or civil courts. Also, the jury deliberation rooms are sized to be convertible to judicial chambers, and the business offices in the podium feature large open floor plans for future programmatic evolution.
— Landmark design that celebrates the skyline. While not the city’s tallest building, the courthouse is among its most distinctive high-rises, with its angular, monolithic form topped with a distinguishing canopy structure that shades its east façade. Shaped aluminum panels form the soffit for the canopy and are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. This design feature gives the courthouse a bold civic identity within the skyline and “celebrates the unique light of San Diego,” say its designers.
— Enhanced seismic design. After evaluating several structural options, the team selected a solution that was both cost effective and would meet the client’s “enhanced” seismic performance objective. The structural system consists of a cost-efficient steel-framed superstructure with two-way lateral special moment frames that incorporate 106 nonlinear viscous damping devices (VDD). The VDDs were placed along the height of the structure, from level six to the roof, with four to six VDDs at each level. The viscous dampers provide a distributed supplemental energy dissipating damping system over the height of the structure to reduce seismically induced building story shears, story drifts, floor accelerations, and inelastic rotational demands on moment frame beam-column joints. They are also effective in providing damping for wind loads.
“The San Diego Central Courthouse increases the access to justice for citizens of San Diego County by consolidating 71 court departments,” said Clifford Ham, Judicial Council of California Administrative Office of the Courts. “The building is both noble and efficient, representing the importance of the Superior Court of California in this community and providing a safe, well-organized, technically sophisticated environment for the judicial proceedings.”
The project team built models and full-scale mockups to gather feedback from the judges, court staff, and secretarial user groups. Courtesy SOM.
Building Team — Submitting firm, architect, structural engineer Skidmore, Owings & Merrill Owner Judicial Council of California Administrative Office of The Courts MEP engineer WSP General contractor Rudolph and Sletten
General Information — Size 704,000 sf Construction cost $465 million Construction time December 2013 to December 2017 Delivery method Design-bid-build
Return to the 2018 Building Team Awards Landing Page
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.