A high-performance barn

Sponsored Content

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.


By Star Building Systems   | March 10, 2014
Completed in 2012, a 2,100-sf custom metal building serves as a maintenance and
Completed in 2012, a 2,100-sf custom metal building serves as a maintenance and storage facility for Bastoni Vineyards in Sonoma

The old wooden horse barn on the grounds of Bastoni Vineyards in Santa Rosa, Calif., had outlived its usefulness.

“It was really cool looking, but it certainly wasn’t meeting our needs at all,” says Russ Messana, owner of the 40-acre Sonoma County vineyard. “We no longer have horses, so I was using it to store the nets for the grapevines and a log splitter. And I couldn’t use it for much of anything else.” 

So Messana decided to replace the 70-year-old structure with a more functional, efficient and secure version. A custom metal building from Star Building Systems enabled him to achieve a similar barn aesthetic with the clear span and height requirement he required.

“You can do so many different things with steel buildings,” says Greg Tonks, owner of The Steel Building Guys, the Star builder that constructed the structure. “Erection is a lot more economical than with conventional buildings. The siding lasts longer, the roof lasts longer, you don’t have to paint it and the potential finishes are a lot more diverse.”

The 2,100-sf structure features a 700-sf second-level mezzanine with a plywood floor. That’s where Messana stores the nets that protect his zinfandel grapes from birds and other predators.

“I have more room in the mezzanine now than I had in the original barn,” Messana says. “I have definitely gained a lot more usable space.”

Insulated sliding barn doors on three walls and an upper sliding barn door maximize the building’s functionality, while the fully-functional louvered cupolas and weathervane atop the building add authenticity to the structure.

White roof panels are accented by white wood trim around the windows and barn doors, and a 2-inch by 12-inch accent band around the building breaks up the height of the panels.  

“From a distance, it looks like an old-style barn,” Messana says. But it functions like a modern, efficient maintenance and storage facility. 

The new building also serves as an ideal venue for hosting groups. Many of the winemakers that purchase grapes from Bastoni have started bringing their customers to the building for wine tasting and to meet Messana.

“A lot of people who buy wines like to know the history and story behind the wine, and to meet the winemaker,” Messana says. “That builds customer loyalty.”  

The structure also serves as a meeting place for the local Model A car club and has attracted interest from other local businesses eager to get ideas for their own buildings.   

“I have gotten so many positive comments on the barn, its location and view over the vineyard that we’re planning to open it up to rent for weddings, birthdays and other community events,” Messana says.

 

 

Highly flexible, the building can be adapted to accommodate a caterer, band, tables and chairs, and groups of up to 400 people. 

Messana says his new building provides him with a much cleaner, safer and secure environment than the previous barn. 

“The maintenance is virtually zero when compared to the old barn, which needed to be painted and exterminated regularly,” he says. “Because of the positive experience I’ve had, I’m now planning to replace another barn with a metal building.”

Owner: Russ and Martha Messana
Star builder and general contractor: The Steel Building Guys
Wall panels: PBR
Roof panels: PBR

 

Related Stories

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Data Centers Report: Demand ‘exploding’

BD+C's Giants 300 Top 25 AEC Firms in the Data Center sector.

| Jul 20, 2012

Office Report: Fitouts, renovations keep sector moving

BD+C's Giants 300 Top 25 AEC Firms in the Office sector.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 20, 2012

3 important trends in hospital design that Healthcare Giants are watching closely

BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 20, 2012

Firms bracing for DoD cuts

The Giants 300 Top 25 AEC Firms in the Military sector.

| Jul 20, 2012

Gensler, Stantec, Turner lead ‘green’ firms

The Top 10 AEC Firms in Green Buildings and LEED Accredited Staff.

| Jul 19, 2012

Renovation resurgence cuts across sectors

Giants 300 reconstruction sector firms ‘pumping fresh blood in tired spaces.’

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021