Last month, All Aboard Brightline, Florida’s hospitality focused high-speed intercity passenger rail service, extended its service to MiamiCentral, a new 200,000-sf terminal on 11 acres in downtown Miami.
MiamiCentral is part of the only privately owned, operated, and maintained intermodal development in the U.S. Brightline’s rail system now includes nonstop service from Miami to a 27,500-sf station on 4.8 acres of land in downtown Fort Lauderdale, and a 60,000-sf station in downtown West Palm Beach, Fla. The Fort Lauderdale and West Palm stations opened on January 13.
All Aboard Brightline intends to expand this system’s service to Orlando eventually. According to a recent study by the Washington Economics Group, the Brightline rail system is projected to attract more than $6 billion in investments in Florida’s economy by 2022.
All Aboard Brightline secured state approval to sell bonds to pay for this project, whose cost is estimated at $3 billion. All Aboard Brightline is part of Florida East Coast Industries, a Coral Gables, Fla.-based holding company invested in real estate and transportation, with more than $46 billion in infrastructure assets under its management.
MiamiCentral is, in fact, a mixed-use development that spans six downtown blocks. It includes Two MiamiCentral, a 195,000-sf office tower that is scheduled to open late this year; and Three MiamiCentral, a 90,000-sf office tower with 35,000 sf of retail, that opened last December. (Yesterday, The Real Deal reported that Viacom had recently leased 24,000 sf on the 12th floor of Three MiamiCentral, which is now at 95% occupancy.)
The complex will eventually include 1.43 million sf of residential, which is scheduled to open next year.
The 200,000-sf MiamiCentral station is elevated 50 feet above street level, where there's leased space for retail. Image: Smilodon GC
The MiamiCentral train station and its platforms are elevated 50 feet in the air in response to the density of the site. Street-level retail spaces are beneath the tracks. Elevated parking garages are situated above the rails and lift vehicles by elevator. A pool and green space sit atop the garage and in between the towers. “What makes the design unique is that it flips the idea of the traditional train station,” says Roger Duffy, FAIA, NCARB, Design Partner on the project. “We built the railway above grade to avoid interfering with existing street flow and, if you dig too deep under Miami, you hit the water.”
Duffy works for Skidmore, Ownings & Merrill, which in association with Florida-based Zyscovich Architects designed the three stations. Rockwell Group designed the interior check-in areas, food and beverage areas that are operated by Brightline, and lounges. Suffolk Construction was the GC on the Miami station, and Moss & Associates built the West Palm Beach and Fort Lauderdale stations.
For MiamiCentral, SOM converted the site of a former 1920s train station—which had been used for decades as a parking lot—into a 21st Century terminal. Commuters can use an app to book their trips and check train schedules. The trains themselves offer riders a baggage rack, bike rack, seating area tabletop electrical outlets, and bathrooms.
All Aboard Brightline intends to expand its service into Orlando eventually. One study estimates that the new rail system could attract more than $6 billion in new investments. Image: Brightline
One of SOM's primary design objectives was to create a sense of overall unity for the entire transportation network, while conveying a sense of identity for each station. SOM unified the stations' designs by exposing their structural forms—V-shaped bracing—as the main architectural expression, and by bringing in natural light through ample use of glass.
The Fort Lauderdale station rises above surrounding buildings and features a sequence of stacked glass boxes that provide a visual connection to the city. The West Palm station is sheathed in a glass façade, and its departure lounge is suspended 30 feet above the train platform.
Olin McKenzie, AIA, NCARB, Director at SOM, says the intention of this project is to “create new districts in these cities.”
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard