The NFL’s Minnesota Vikings franchise is aware what a heavy accumulation of snow can do. Late in the 2010 season, the Twin Cities were hit by a blizzard, and 17 inches of snow came to rest on the Metrodome’s air-supported Teflon and fiberglass roof. All the weight and moisture caused the roof to puncture and collapse. The stadium was repaired the next summer for $22.7 million.
For the team’s new stadium, which was designed by HKS Architects and is set to open next fall, the team is ensuring that the roof will hold up to rough northern conditions. U.S. Bank Stadium will have an ETFE (ethylene tetrafluoroethylene) pneumatic roof, a durable, flexible material made of a polymer similar to Teflon, as the Minneapolis Star-Tribune reports. ETFE is 1/100th the weight of glass and can stretch three times its length without losing elasticity.
The ETFE pillows are still supported by air, but they are also backed by a steel structure and won’t sink due to a loss of air pressure. The panels can be punctured by sharp objects but are easy to patch, and the nonstick surface and steep angle will help prevent snow from piling high.
ETFE also is lightweight and translucent, allowing natural light to enter for a sense of openness. Domed stadiums of the past, like the Metrodome, were known for being dark and cavernous.
Roughly 248,000 sf of the roof will be composed of ETFE; the remaining portion will be a steeply-pitched hard roof, but sunlight will still angle over the entire field. According to the Vikings’ website, ETFE will not degrade when exposed to UV light. Altogether, U.S. Bank Stadium will cost just more than $1 billion to build.
ETFE has previously been installed at venues like the Beijing National Stadium in China, the Eden Project in Cornwall, U.K., and Allianz Arena in Munich.
Related Stories
Sports and Recreational Facilities | May 6, 2016
NBA’s Atlanta Hawks to build new practice center with attached medical facilities
The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy.
BIM and Information Technology | May 2, 2016
How HDR used computational design tools to create Omaha's UNO Baxter Arena
Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.
Mixed-Use | May 1, 2016
A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas
Construction will soon begin on housing, retail, and office spaces.
Sports and Recreational Facilities | Apr 17, 2016
An expanded and renovated complex brings together U. of Colorado’s sports programs
This two-year project enhances the experiences of athletes and fans alike.
Sports and Recreational Facilities | Apr 13, 2016
Cubs take a measured approach when planning HD video boards
Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.
Sports and Recreational Facilities | Apr 13, 2016
More than a game: 4 ways sports teams are adapting to changing fan preferences
As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.
Sports and Recreational Facilities | Apr 11, 2016
Chicago Cubs continue Wrigley Field renovations with new clubhouse
The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse.
Sports and Recreational Facilities | Apr 6, 2016
Las Vegas debuts another new arena, with a number of ‘firsts’
The gambling mecca has its eyes on attracting a pro sports team.
Sports and Recreational Facilities | Apr 5, 2016
The importance of true cost-modeling for sports facilities
Many factors prevent sports facilities from immediate profitability. Rider Levett Bucknall’s Peter Knowles and Steve Kelly write that cost modeling, the process of estimating construction expenses by analyzing fixed and variable expenses, can push facility development to financial success.
Sports and Recreational Facilities | Apr 1, 2016
San Diego Chargers announce plan for downtown stadium and convention center
The project will be funded primarily by a tax increase on hotel stays.