flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Hills of Governors Island reach completion one year ahead of schedule

Sports and Recreational Facilities

The Hills of Governors Island reach completion one year ahead of schedule

The man made hills are the latest attraction to open on the island that has been under development since 2006.


By David Malone, Associate Editor | August 22, 2016

Photo courtesy of STV

Rising between 25 and 70 feet above sea level, four man-made hills on the southern tip of New York City’s Governors Island opened to the public in July, one full year ahead of schedule. Dubbed The Hills, the new attraction boasts walking paths, recreational opportunities, and full 360-degree vistas of New York Harbor. And while the Hills offer strong aesthetic value and public space for outdoor activities, they also provide a resiliency measure to protect the island against rising sea levels.

The first phase of construction for the island, which can only be accessed by ferry, was completed in 2014 and consisted of 30 new acres of park and public spaces; an upgrade to Soissons Dock, the only vehicular landing on the island; transfer bridges and approach platforms at the dock; reconstruction of the seawall and the island’s drainage system; restoration of potable water and electrical distribution systems; and stabilization of historic buildings.

As part of a joint venture, STV is providing resident engineering inspection and design review services for the implementation of the Governors Island Park and Public Space Master Plan. In addition to changing 10 acres of flat land into rolling hills that would have Julie Andrews singing like it was 1965, the island’s Master Plan also calls for over 75,000 new plantings, which includes 42,963 shrubs and 2,960 trees.

In creating the hills, STV saved in construction costs by using terraced, mechanically stabilized earth and lightweight fill rather than going the more traditional route using deep soil mixing methods. In addition to the monetary savings, this method also reduced the overall weight on the underground utilities and sea well.

Included in the four hills are Grassy Hill, which is the first to be seen when approaching from the park; Slide Hill, which includes four slides built into the hill itself, including a 57-foot long slide that is the longest in New York City; Outlook Hill, which features “The Scramble,” a shortcut cutting straight up the hill constructed from blocks of granite from the seawall the Army placed in the harbor when they expanded the island in 1905; and Discovery Hill, which features a site-specific work of art from British artist Rachel Whiteread. 

With The Hills completed, the next step of the Master Plan for Governors Island calls for improvements to Picnic Point and the 2.2 mile promenade.

West 8 provided design services for the island’s transformation.

Related Stories

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

Sports and Recreational Facilities | Apr 11, 2016

Chicago Cubs continue Wrigley Field renovations with new clubhouse

The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse. 

Sports and Recreational Facilities | Apr 6, 2016

Las Vegas debuts another new arena, with a number of ‘firsts’

The gambling mecca has its eyes on attracting a pro sports team. 

Sports and Recreational Facilities | Apr 5, 2016

The importance of true cost-modeling for sports facilities

Many factors prevent sports facilities from immediate profitability. Rider Levett Bucknall’s Peter Knowles and Steve Kelly write that cost modeling, the process of estimating construction expenses by analyzing fixed and variable expenses, can push facility development to financial success.

Sports and Recreational Facilities | Apr 1, 2016

San Diego Chargers announce plan for downtown stadium and convention center

The project will be funded primarily by a tax increase on hotel stays.  

Sports and Recreational Facilities | Mar 31, 2016

An extreme sports tower for climbing and BASE jumping is proposed for Dubai’s waterfront

The design incorporates Everest-like base camps for different skill levels.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021