flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Historic Fresno train depot to be renovated for California high speed rail station project

Transit Facilities

Historic Fresno train depot to be renovated for California high speed rail station project

Work includes upgrades for accessibility, fire and life-safety, and seismic standards


By Peter Fabris, Contributing Editor | July 10, 2024
Historic Fresno train depot to be renovated for California high speed rail station project. Courtesy California High-Speed Rail Authority
Courtesy California High-Speed Rail Authority

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

Design firm Page & Turnbull will work on the historic station, with a focus on accessibility updates, upgrades to meet modern fire and life-safety codes and structural and seismic standards, and the rehabilitation of key architectural features of the historic Queen Anne-style depot, built of red brick with a slate bellcast hip-roof and cupolas. Foster + Partners will design a new intermodal station at the site.

The new HSR hub will connect the historic transit depot’s former passenger and freight train stations, as realized through extensive, preliminary site surveys and 3D modeling. Attention to strengthening the buildings’ structural and seismic integrity is a priority, potentially through discrete structural approaches that will preserve the buildings’ original brick walls, such as the integration of obscured concrete columns.

The historic train depot is listed in the National Register of Historic Places. It opened in 1872 as the Central Pacific Railroad station and was later developed into the Southern Pacific Depot, whose service ceased in the early 1970s. The site includes the historic passenger depot, freight depot/railway express agency building, and Pullman Shed.  

As a part of the Phase 1, 119-mile Central Valley segment of the California HSR system that also includes Northern and Southern California segments, the 65-mile project section between Merced and Fresno link the Central Valley and Silicon Valley with stations in downtown Fresno and downtown Merced. The Central Valley segment will connect San Francisco to Los Angeles in less than three hours, with service expected to begin in 2027.  

When complete, the 800-mile system from Sacramento to San Diego, will include an anticipated 24 HSR stations, with arriving and departing trains travelling at some 200 miles per hour. Phase 1’s 520-mile segment consists of the San Francisco/Merced to Los Angeles/Anaheim section.

Owner and/or developer: California High-Speed Rail Authority
Architect of record for intermodal station: Foster + Partners
Architect of record for historic station: Page & Turnbull
Engineers for intermodal station: Arup

Historic Fresno train depot to be renovated for California high speed rail station project. Courtesy California High-Speed Rail Authority
Courtesy California High-Speed Rail Authority
Historic Fresno train depot to be renovated for California high speed rail station project. Courtesy California High-Speed Rail Authority
Courtesy California High-Speed Rail Authority
Historic Fresno train depot to be renovated for California high speed rail station project. Courtesy California High-Speed Rail Authority
Courtesy California High-Speed Rail Authority
Historic Fresno train depot to be renovated for California high speed rail station project. Courtesy California High-Speed Rail Authority
Courtesy California High-Speed Rail Authority

Related Stories

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 1, 2014

Super BIM: 7 award-winning BIM/VDC-driven projects

Thom Mayne's Perot Museum of Nature and Science and Anaheim's new intermodal center are among the 2014 AIA TAP BIM Award winners. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Free transit for everyone! Then again, maybe not

An interesting experiment is taking place in Tallinn, the capital of Estonia, where, for the last year or so, its 430,000 residents have been able to ride the city’s transit lines practically for free. City officials hope to pump up ridership by 20%, cut carbon emissions, and give low-income Tallinnites greater access to job opportunities. But is it working?

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021