Palmer Auditorium, on the campus of Connecticut College in New London, is an Art Deco theater designed by William F. Lamb in 1939, who also designed the Empire State Building in New York City. The theater has a long history of hosting acclaimed artists, musicians, and performers, from Dizzy Gillespie to Yo-Yo Ma.
This spring, the 38,500-sf building entered a new era, thanks to its new name—the Athey Center for Performance and Research at Palmer Auditorium—and a $23 million renovation by a team that included the architecture firm Ennead Architects, which modernized the facility to support teaching, learning and performance across a spectrum of disciplines.
The project dates back to 2018 and took 24 months of construction. It was completed in April, and included a new entrance, façade renewal, and interior renovation to the auditorium, lobbies, lounges, costume and workshop, as well as the teaching, administrative, and support spaces.
“A lot of things needed improvement,” says Brian Masuda, Associate Principal with Ennead Architects, whom BD+C interviewed with Molly McGowan, a Partner at the firm. Prior to the renovation, clerestories in the auditorium had been boarded up, and the building, says Masuda, “was very dark, and kind of shut off from the rest of the campus.” So it was imperative to bring more natural light into the building, including onto its historic wood stairs that were preserved and restored.
The renovation opened up three sides of the building with glass door fronts and feature walls. On the building’s historic side, the team replaced deteriorating spandrels with lightboxes made with cast glass. And where appropriate, transparent materials were used. Inside, the lobby window looks down onto the studio. And the theater department, which had been scattered throughout the building, was consolidated within one wing.
McGowan says the renovation “recognizes the history of the building” while, at the same time, making what is now part of the college’s Theater Department more modern. The challenge, says Masuda, was blending the old and the new, from rehanging the lobby’s lighting pendants to adding modern furniture and new carpeting with an Art Deco-like chevron pattern.
SUBTLE RENOVATION ADDITIONS
About 500 usable square footage were added to the building during the renovation. By making small adjustments to the building plans within the existing footprint, Ennead created a new lounge area and box office with an expanded public lobby. The lobby spaces on two levels were re-imagined to serve as informal teaching and study spaces. Two key elements were introduced at the main level lobby: a highly visible entry to the Theater Department’s administrative suite and a visual connection to the newly created teaching studio.
The auditorium seating now provides access that complies with the Americans with Disabilities Act, as well as improved sight lines, better acoustics, a new state, and visual technology upgrades.
“The renovations have resulted in a magnificent transformation that promises to make the Athey Center a destination for the region and an inspiration for future generations of student performers ready to make a difference with their art,” said Connecticut College’s president Katherine Bergeron.
The Building Team on this project included A/Z Corp (GC), Altieri (ME), Silman (SE), and Next Stage (theatrical consultant).
Related Stories
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| Apr 12, 2011
Long-awaited San Francisco center is music to jazz organization’s ears
After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood