When completed in 2019, the HKS-designed L.A. Stadium at Hollywood Park will be the largest stadium in the NFL, covering about 3 acres and 3 million sf. The stadium will include permanent seating for 70,000 fans while offering the flexibility to expand to host more than 100,000 fans.
The new stadium will provide an outdoor feel thanks to its ethylene tetrafluoroethylene (ETFE) roof, the same material used for the Minnesota Vikings new stadium, which was also designed by HKS. The ETFE canopy will allow the venue to host events year-round and provide an outdoor feel while protecting guests from the elements.
A perforated metal skin, comprising more than 75,000 individual panels, curves around the stadium and the ETFE canopy and will create an open-air environment. Each panel will be uniquely sized and have a distinct perforation pattern. The metal skin stretches beyond just the stadium and also covers outdoor plaza spaces and ‘rooms’ to blur the lines between indoor and outdoor. Included in the stadium’s design are a performing arts center and a large public gardens.
The stadium is already slated to host Super Bowl LV in 2021. Turner and AECOM will lead the project’s construction and Kroenke Sports and Entertainment is managing and developing the project.
Courtesy of HKS
Courtesy of HKS
Related Stories
| Jul 28, 2014
Reconstruction Sector Architecture Firms [2014 Giants 300 Report]
Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 23, 2014
Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns
A new aquarium on Brazil's northeastern coast is designed, engineered, constructed and financed by U.S. firms and institutions.
| Jul 23, 2014
Architecture Billings Index up nearly a point in June
AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.
| Jul 21, 2014
Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]
According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.
| Jul 18, 2014
Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]
“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.
| Jul 18, 2014
Top Construction Management Firms [2014 Giants 300 Report]
Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States.
| Jul 18, 2014
Top Contractors [2014 Giants 300 Report]
Turner, Whiting-Turner, Skanska top Building Design+Construction's 2014 ranking of the largest contractors in the United States.
| Jul 18, 2014
Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]
Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report.
| Jul 18, 2014
Top Engineering/Architecture Firms [2014 Giants 300 Report]
Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.
| Jul 18, 2014
Top Engineering Firms [2014 Giants 300 Report]
Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.