flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HMC Architects in service to the community

HMC Architects in service to the community

HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.


By By Robert Cassidy | October 4, 2012
HMC volunteers install planters in a vertical garden wall at the Second Harvest
HMC volunteers install planters in a vertical garden wall at the Second Harvest Food Bank, in New Orleans. HMC employees and its
This article first appeared in the October 2012 issue of BD+C.

HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks. Employees raised $4,200 for assistance to Haitian earthquake victims; another $5,000, plus a $5,000 match from HMC’s Designing Futures Foundation, went to victims of Japan’s tsunami. Janice Endsley and HMC colleagues have volunteered at the Sea No Evil Art Show, an annual benefit for the Sea Shepherd Conservation Society, which has raised $300,000 for ocean mammal protection in the past five years.

HMC Project Manager Andrea Ruelas, LEED AP BD+C, led a fundraising effort through her church to benefit Ciudad de los Niños Orphanage in Matamoros, Mexico.

Konni Doi, CID, LEED AP, Principal/Senior Interior Designer, managed the distribution of donated computer tables, chairs, and other furniture from long-time HMC vendor KI. The furniture, estimated to be worth $10,000-20,000, found a home at the Riverside, Calif., facility of Operation SafeHouse, an emergency shelter for teens. +

Related Stories

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021