HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks. Employees raised $4,200 for assistance to Haitian earthquake victims; another $5,000, plus a $5,000 match from HMC’s Designing Futures Foundation, went to victims of Japan’s tsunami. Janice Endsley and HMC colleagues have volunteered at the Sea No Evil Art Show, an annual benefit for the Sea Shepherd Conservation Society, which has raised $300,000 for ocean mammal protection in the past five years.
HMC Project Manager Andrea Ruelas, LEED AP BD+C, led a fundraising effort through her church to benefit Ciudad de los Niños Orphanage in Matamoros, Mexico.
Konni Doi, CID, LEED AP, Principal/Senior Interior Designer, managed the distribution of donated computer tables, chairs, and other furniture from long-time HMC vendor KI. The furniture, estimated to be worth $10,000-20,000, found a home at the Riverside, Calif., facility of Operation SafeHouse, an emergency shelter for teens. +
Related Stories
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.