Airbus Appoints Program Manager for its Mobile Assembly Line
Alabama-based Company Now Responsible for All Aspects of Facility’s Construction
February 1, 2013: Airbus announced the selection of Hoar Program Management (HPM), an Alabama-based company, as program manager for its A320 Family assembly line in Mobile, Alabama. In this role, HPM will be responsible for managing all aspects of the design and construction of the facility, including supporting procurement of design and construction service providers and suppliers. Construction is scheduled to begin this summer.
HPM’s staff has been responsible for total projects valued in excess of $3.5 billion in recent years. HPM currently has offices in Birmingham, Huntsville and Mobile, Alabama; Houston, Texas; Nashville, Tennessee; Tampa, Florida; and Charlotte, North Carolina. The company is well known as a distinct leader and provider of program management services, serving clients such as Regions Bank, Auburn University, the University of Alabama, Mobile Infirmary, the City of Mobile, Disney, Apple, Coca-Cola and Alabama Power.
“After a vigorous competitive process, we’ve reached another major milestone with the appointment of a program manager,” said Airbus Americas Chairman Allan McArtor. “Working together with Hoar, we are ready to begin construction on Airbus’ first industrial facility in the U.S. Once finished, the new A320 assembly facility will be the most modern and technologically advanced in Airbus’ global assembly network.”
“This is truly an honor and a privilege,” said Mike Lanier, President of HPM. “Our folks have been working for months learning about Airbus, getting to understand their needs, their North American strategy, and how this complex in Mobile fits into their global strategy. Each of us is humbled at this selection and the opportunity and responsibility we have been given to lead this project. I believe our selection for this assignment is a testament to the outstanding people we have in our firm and the passion they bring to their roles in serving each of our clients every day. Airbus is the latest to recognize the value we add to their projects and the leadership our teams provide.”
On July 2, 2012 Airbus announced it will establish a manufacturing facility in the United States to assemble and deliver A319, A320 and A321 aircraft. Located at the Brookley Aeroplex in Mobile, Alabama, it will be the company’s first U.S.-based production facility. The assembly line, which will create jobs and strengthen the aerospace industry, is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.
Aircraft assembly is planned to start in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018
About Airbus Americas: Airbus manufactures the most modern and eco-efficient family of airliners available, ranging from 100 to over 500 seats. At its facilities in Wichita, Kansas and Mobile, Alabama, Airbus Americas helps engineer the entire product line. Additionally, Airbus supports, trains and sells to customers in the Americas from its centers in suburban Washington D.C. and Miami. Airbus has spent more than $140 billion in the U.S. since 1990 with hundreds of American suppliers in more than 40 states.
About Hoar Program Management (HPM): HPM was created in the mid 1990s as a way to offer years of comprehensive capital project experience to clients who lack sufficient professional design and construction management staff. HPM works with clients in the manufacturing, industrial, healthcare, institutional, retail and commercial markets.
Related Stories
Apartments | Mar 13, 2024
A landscaped canyon runs through this luxury apartment development in Denver
Set to open in April, One River North is a 16-story, 187-unit luxury apartment building with private, open-air terraces located in Denver’s RiNo arts district. Biophilic design plays a central role throughout the building, allowing residents to connect with nature and providing a distinctive living experience.
Affordable Housing | Mar 12, 2024
An all-electric affordable housing project in Southern California offers 48 apartments plus community spaces
In Santa Monica, Calif., Brunson Terrace is an all-electric, 100% affordable housing project that’s over eight times more energy efficient than similar buildings, according to architect Brooks + Scarpa. Located across the street from Santa Monica College, the net zero building has been certified LEED Platinum.
Contractors | Mar 12, 2024
The average U.S. contractor has 8.1 months worth of construction work in the pipeline, as of February 2024
Associated Builders and Contractors reported that its Construction Backlog Indicator declined to 8.1 months in February, according to an ABC member survey conducted Feb. 20 to March 5. The reading is down 1.1 months from February 2023.
Museums | Mar 11, 2024
Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion
In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.
Affordable Housing | Mar 11, 2024
Los Angeles’s streamlined approval policies leading to boom in affordable housing plans
Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.
BIM and Information Technology | Mar 11, 2024
BIM at LOD400: Why Level of Development 400 matters for design and virtual construction
As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.
AEC Tech | Mar 9, 2024
9 steps for implementing digital transformation in your AEC business
Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.
Sports and Recreational Facilities | Mar 7, 2024
Bjarke Ingels’ design for the Oakland A’s new Las Vegas ballpark resembles ‘a spherical armadillo’
Designed by Bjarke Ingels Group (BIG) in collaboration with HNTB, the new ballpark for the Oakland Athletics Major League Baseball team will be located on the Las Vegas Strip and offer panoramic views of the city skyline. The 33,000-capacity covered, climate-controlled stadium will sit on nine acres on Las Vegas Boulevard.
Adaptive Reuse | Mar 7, 2024
3 key considerations when converting a warehouse to a laboratory
Does your warehouse facility fit the profile for a successful laboratory conversion that can demand higher rents and lower vacancy rates? Here are three important considerations to factor before proceeding.
Shopping Centers | Mar 7, 2024
How shopping centers can foster strong community connections
In today's retail landscape, shopping centers are evolving beyond mere shopping destinations to become vibrant hubs of community life. Here are three strategies from Nadel Architecture + Planning for creating strong local connections.