Airbus Appoints Program Manager for its Mobile Assembly Line
Alabama-based Company Now Responsible for All Aspects of Facility’s Construction
February 1, 2013: Airbus announced the selection of Hoar Program Management (HPM), an Alabama-based company, as program manager for its A320 Family assembly line in Mobile, Alabama. In this role, HPM will be responsible for managing all aspects of the design and construction of the facility, including supporting procurement of design and construction service providers and suppliers. Construction is scheduled to begin this summer.
HPM’s staff has been responsible for total projects valued in excess of $3.5 billion in recent years. HPM currently has offices in Birmingham, Huntsville and Mobile, Alabama; Houston, Texas; Nashville, Tennessee; Tampa, Florida; and Charlotte, North Carolina. The company is well known as a distinct leader and provider of program management services, serving clients such as Regions Bank, Auburn University, the University of Alabama, Mobile Infirmary, the City of Mobile, Disney, Apple, Coca-Cola and Alabama Power.
“After a vigorous competitive process, we’ve reached another major milestone with the appointment of a program manager,” said Airbus Americas Chairman Allan McArtor. “Working together with Hoar, we are ready to begin construction on Airbus’ first industrial facility in the U.S. Once finished, the new A320 assembly facility will be the most modern and technologically advanced in Airbus’ global assembly network.”
“This is truly an honor and a privilege,” said Mike Lanier, President of HPM. “Our folks have been working for months learning about Airbus, getting to understand their needs, their North American strategy, and how this complex in Mobile fits into their global strategy. Each of us is humbled at this selection and the opportunity and responsibility we have been given to lead this project. I believe our selection for this assignment is a testament to the outstanding people we have in our firm and the passion they bring to their roles in serving each of our clients every day. Airbus is the latest to recognize the value we add to their projects and the leadership our teams provide.”
On July 2, 2012 Airbus announced it will establish a manufacturing facility in the United States to assemble and deliver A319, A320 and A321 aircraft. Located at the Brookley Aeroplex in Mobile, Alabama, it will be the company’s first U.S.-based production facility. The assembly line, which will create jobs and strengthen the aerospace industry, is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.
Aircraft assembly is planned to start in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018
About Airbus Americas: Airbus manufactures the most modern and eco-efficient family of airliners available, ranging from 100 to over 500 seats. At its facilities in Wichita, Kansas and Mobile, Alabama, Airbus Americas helps engineer the entire product line. Additionally, Airbus supports, trains and sells to customers in the Americas from its centers in suburban Washington D.C. and Miami. Airbus has spent more than $140 billion in the U.S. since 1990 with hundreds of American suppliers in more than 40 states.
About Hoar Program Management (HPM): HPM was created in the mid 1990s as a way to offer years of comprehensive capital project experience to clients who lack sufficient professional design and construction management staff. HPM works with clients in the manufacturing, industrial, healthcare, institutional, retail and commercial markets.
Related Stories
| Jan 9, 2012
Lutron appoints Pessina president
In his 35-year career with Lutron, Pessina has acquired broad experience in the engineering, quality assurance and manufacturing areas.
| Jan 9, 2012
A new journey for KSS Architects co-founder
Kehrt's legacy of projects include Rutgers University's Biomedical Engineering Building, the renovation and expansion of Cornell University School of Hotel Administration, the recent new campus center at The Richard Stockton College of New Jersey and Princeton Township's Municipal Complex.
| Jan 8, 2012
TCA releases The Construction of Tilt-Up
The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up
| Jan 8, 2012
WHR Architects promotes Joel Colwell, AIA, to principal
With over 30 years of experience, Colwell has managed large-scale, complex projects for major healthcare systems as well as challenging smaller renovations and additions — all with notable success.
| Jan 6, 2012
Doug Wignall named president of HDR Architecture
HDR Architecture, Inc. is known for its award-winning designs for urban environments, campuses and buildings in the healthcare, science and technology, civic, justice and higher education markets.
| Jan 6, 2012
Gensler unveils restoration and expansion of Houston's Julia Ideson building
The "new" building will serve as a repository of Houston memorabilia and rare archival material as well as the city's official reception space and a venue for exhibits, meetings and other special events.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Jan 4, 2012
Siemens acquires Pace Global Energy Services
Acquisition will enhance portfolio with new energy consulting and management services.
| Jan 4, 2012
Shawmut Design & Construction awarded dorm renovations at Brown University
Construction is scheduled to begin in June 2012, and will be completed by December 2012.