Airbus Appoints Program Manager for its Mobile Assembly Line
Alabama-based Company Now Responsible for All Aspects of Facility’s Construction
February 1, 2013: Airbus announced the selection of Hoar Program Management (HPM), an Alabama-based company, as program manager for its A320 Family assembly line in Mobile, Alabama. In this role, HPM will be responsible for managing all aspects of the design and construction of the facility, including supporting procurement of design and construction service providers and suppliers. Construction is scheduled to begin this summer.
HPM’s staff has been responsible for total projects valued in excess of $3.5 billion in recent years. HPM currently has offices in Birmingham, Huntsville and Mobile, Alabama; Houston, Texas; Nashville, Tennessee; Tampa, Florida; and Charlotte, North Carolina. The company is well known as a distinct leader and provider of program management services, serving clients such as Regions Bank, Auburn University, the University of Alabama, Mobile Infirmary, the City of Mobile, Disney, Apple, Coca-Cola and Alabama Power.
“After a vigorous competitive process, we’ve reached another major milestone with the appointment of a program manager,” said Airbus Americas Chairman Allan McArtor. “Working together with Hoar, we are ready to begin construction on Airbus’ first industrial facility in the U.S. Once finished, the new A320 assembly facility will be the most modern and technologically advanced in Airbus’ global assembly network.”
“This is truly an honor and a privilege,” said Mike Lanier, President of HPM. “Our folks have been working for months learning about Airbus, getting to understand their needs, their North American strategy, and how this complex in Mobile fits into their global strategy. Each of us is humbled at this selection and the opportunity and responsibility we have been given to lead this project. I believe our selection for this assignment is a testament to the outstanding people we have in our firm and the passion they bring to their roles in serving each of our clients every day. Airbus is the latest to recognize the value we add to their projects and the leadership our teams provide.”
On July 2, 2012 Airbus announced it will establish a manufacturing facility in the United States to assemble and deliver A319, A320 and A321 aircraft. Located at the Brookley Aeroplex in Mobile, Alabama, it will be the company’s first U.S.-based production facility. The assembly line, which will create jobs and strengthen the aerospace industry, is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.
Aircraft assembly is planned to start in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018
About Airbus Americas: Airbus manufactures the most modern and eco-efficient family of airliners available, ranging from 100 to over 500 seats. At its facilities in Wichita, Kansas and Mobile, Alabama, Airbus Americas helps engineer the entire product line. Additionally, Airbus supports, trains and sells to customers in the Americas from its centers in suburban Washington D.C. and Miami. Airbus has spent more than $140 billion in the U.S. since 1990 with hundreds of American suppliers in more than 40 states.
About Hoar Program Management (HPM): HPM was created in the mid 1990s as a way to offer years of comprehensive capital project experience to clients who lack sufficient professional design and construction management staff. HPM works with clients in the manufacturing, industrial, healthcare, institutional, retail and commercial markets.
Related Stories
| Oct 5, 2011
GREENBUILD 2011: Software an architectural game changer
Interactive modeling software transforms the designbuild process.
| Oct 5, 2011
GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes
Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.
| Oct 5, 2011
GREENBUILD 2011: Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance.
| Oct 4, 2011
GREENBUILD 2011
Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.
| Oct 4, 2011
GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle
Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.
| Oct 4, 2011
GREENBUILD 2011: Johnsonite features sustainable products
Products include rubber flooring tiles, treads, wall bases, and more.
| Oct 4, 2011
GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced
Low insulation value reflects value of entire curtain-wall system.
| Oct 4, 2011
GREENBUILD 2011: Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones.
| Oct 4, 2011
GREENBUILD 2011: Two new recycled glass products announced
The two collections offer both larger and smaller particulates.
| Oct 4, 2011
GREENBUILD 2011: Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available.