Airbus Appoints Program Manager for its Mobile Assembly Line
Alabama-based Company Now Responsible for All Aspects of Facility’s Construction
February 1, 2013: Airbus announced the selection of Hoar Program Management (HPM), an Alabama-based company, as program manager for its A320 Family assembly line in Mobile, Alabama. In this role, HPM will be responsible for managing all aspects of the design and construction of the facility, including supporting procurement of design and construction service providers and suppliers. Construction is scheduled to begin this summer.
HPM’s staff has been responsible for total projects valued in excess of $3.5 billion in recent years. HPM currently has offices in Birmingham, Huntsville and Mobile, Alabama; Houston, Texas; Nashville, Tennessee; Tampa, Florida; and Charlotte, North Carolina. The company is well known as a distinct leader and provider of program management services, serving clients such as Regions Bank, Auburn University, the University of Alabama, Mobile Infirmary, the City of Mobile, Disney, Apple, Coca-Cola and Alabama Power.
“After a vigorous competitive process, we’ve reached another major milestone with the appointment of a program manager,” said Airbus Americas Chairman Allan McArtor. “Working together with Hoar, we are ready to begin construction on Airbus’ first industrial facility in the U.S. Once finished, the new A320 assembly facility will be the most modern and technologically advanced in Airbus’ global assembly network.”
“This is truly an honor and a privilege,” said Mike Lanier, President of HPM. “Our folks have been working for months learning about Airbus, getting to understand their needs, their North American strategy, and how this complex in Mobile fits into their global strategy. Each of us is humbled at this selection and the opportunity and responsibility we have been given to lead this project. I believe our selection for this assignment is a testament to the outstanding people we have in our firm and the passion they bring to their roles in serving each of our clients every day. Airbus is the latest to recognize the value we add to their projects and the leadership our teams provide.”
On July 2, 2012 Airbus announced it will establish a manufacturing facility in the United States to assemble and deliver A319, A320 and A321 aircraft. Located at the Brookley Aeroplex in Mobile, Alabama, it will be the company’s first U.S.-based production facility. The assembly line, which will create jobs and strengthen the aerospace industry, is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.
Aircraft assembly is planned to start in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018
About Airbus Americas: Airbus manufactures the most modern and eco-efficient family of airliners available, ranging from 100 to over 500 seats. At its facilities in Wichita, Kansas and Mobile, Alabama, Airbus Americas helps engineer the entire product line. Additionally, Airbus supports, trains and sells to customers in the Americas from its centers in suburban Washington D.C. and Miami. Airbus has spent more than $140 billion in the U.S. since 1990 with hundreds of American suppliers in more than 40 states.
About Hoar Program Management (HPM): HPM was created in the mid 1990s as a way to offer years of comprehensive capital project experience to clients who lack sufficient professional design and construction management staff. HPM works with clients in the manufacturing, industrial, healthcare, institutional, retail and commercial markets.
Related Stories
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Feb 11, 2011
Former Richardson Romanesque hotel now houses books, not beds
The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.
| Feb 11, 2011
Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork
Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.
| Feb 11, 2011
Research facility separates but also connects lab spaces
California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.
| Feb 11, 2011
A feast of dining options at University of Colorado community center, but hold the buffalo stew
The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.
| Feb 11, 2011
Chicago high-rise mixes condos with classrooms for Art Institute students
The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.
| Feb 11, 2011
Iowa surgery center addresses both inpatient and outpatient care
The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.