HOK has appointed Eli Hoisington, AIA, LEED AP, and Susan Klumpp Williams, AIA, LEED AP, as its new co-chief executive officers, succeeding Bill Hellmuth, FAIA, LEED AP, who passed away on April 6, shortly after his scheduled retirement.
Hoisington and Klumpp Williams, who have served as interim co-CEOs since Hellmuth went on medical leave in May 2022, bring a fresh yet familiar perspective to HOK’s leadership. They have previously led two of the firm’s largest offices and are longstanding executive committee members.
Hoisington, the design principal in St. Louis, and Klumpp Williams, the managing principal in Washington, D.C., have collaborated closely with Hellmuth in the past. They will work with HOK’s board to steer the firm’s design vision, business strategy and operations.
Hellmuth’s legacy spans 32 years with HOK, having served as CEO since 2016 and chairman since 2017. His tenure saw HOK win hundreds of design awards, strengthen its commitment to sustainable and regenerative design, open three new offices, diversify its leadership, and increase its pro-bono work and charitable giving. Under Hellmuth’s guidance, HOK earned recognition as one of Time Magazine’s most influential companies and consistently ranked among the world’s largest and greenest architecture/engineering firms.
Hoisington, 46, and Klumpp Williams, now in her 38th year with the firm, break new ground as the youngest and first woman CEOs in HOK’s 68-year history. They bring complementary skill sets and extensive experience to their new roles.
HOK President Carl Galioto, FAIA, LEED AP, praised the new co-CEOs, stating, “Combining Eli’s design expertise and Susan’s business acumen in this new co-CEO leadership structure will drive HOK’s evolution as a more diverse, collaborative and international design firm.”
Hoisington expressed his commitment to enhancing HOK’s global presence as a preeminent, interdisciplinary design firm while building on Hellmuth’s legacy: “Design remains our core focus, shaping everything from project opportunities and business organization to innovation, research, education, mentorship and community engagement. Above all, we will continue using design to improve lives, heal the planet and contribute to the success of our clients.”
Klumpp Williams shared her experience working with Hellmuth: “Having collaborated with Bill in D.C. for 32 years, I understand how he maintained our founders’ vision for a diverse, design-focused practice. Eli and I will work in a similar manner, with him concentrating on design and me continuing my focus on operations.”
As the first woman CEO in HOK’s history, Klumpp Williams acknowledged the significance of her role: “This is an opportunity to underscore the power of diverse leadership. It also demonstrates HOK’s dedication to fostering diversity and inclusion across the firm. I’m eager to contribute to this ongoing transformation and further HOK’s commitment to ensuring that all our staff have equitable experiences in their career growth.”
Related Stories
| Dec 17, 2010
Luxury condos built for privacy
A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.
| Dec 17, 2010
Subway entrance designed to exude Hollywood charm
The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.
| Dec 17, 2010
New engineering building goes for net-zero energy
A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.
| Dec 17, 2010
Vietnam business center will combine office and residential space
The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Dec 17, 2010
ARRA-funded Navy hospital aims for LEED Gold
The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.
| Dec 17, 2010
Arizona outpatient cancer center to light a ‘lantern of hope’
Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.