flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospitality industry turns to HTS Texas for ‘do not disturb’ air conditioned comfort

Hospitality industry turns to HTS Texas for ‘do not disturb’ air conditioned comfort


March 17, 2011

HOUSTON (March 17, 2011) – Large resort hotels and hospitality properties throughout the Southwest have been working with local contractors, engineers and HTS Texas for the latest innovations in quiet heating, ventilating and air conditioning (HVAC) equipment, so hotel guests can rest easily while hotel management enjoys the savings of the latest in energy-efficient technology. The company has completed 12+ projects throughout Texas and the Southwestern U.S. over the past 18 to 24 months, and is currently working on six more hotel projects throughout the region.

From Houston to San Antonio and Austin, Texas to Wichita, Kansas, HTS Texas has supplied water- and air-cooled chiller systems, air-handling units, fan coil units, specialty dehumidifying equipment and other large-scale HVAC systems to provide hotels energy savings with a focus on using noise management “do not disturb” control systems for optimal guest experience. Recent projects include properties for JW Marriott, Hyatt, Embassy Suites, Doubletree Hotels, AVIA Hotel, Westin Galleria, Westin Oaks, Hotel Sorella, Drury Inn, Omni, and other private hotels and resort properties.

“HTS Texas has extensive experience in the hotel and resort industry,” noted HTS Texas Founder and Principal Mike Donovan. “The hospitality industry looks for quality, reliability and energy efficiency, as well as guest comfort when selecting the required large-scale HVAC solutions needed for these properties. Part of a quality guest experience includes a peaceful, good night’s sleep, which shouldn’t be interrupted when HVAC systems switch on and off. Hotel guests should enjoy a comfortable interior climate without giving a second thought about the equipment creating their comfort.”

Among recent projects, HTS Texas’ expertise with vertical stacked fan coil units was tapped for JW Marriott’s newly built 1.1 million square foot, 1,000 room hotel and resort facility outside San Antonio. Working with architects, contractors and engineers for more than two years, HTS Texas provided approximately 1,024 Enviro-Tec vertical stacked fan coil units for the project, as well as variable air volume and fan-powered boxes to support seven hotel zones, the conference center and spa.            HTS Texas also added low sound fan and unit construction and silent contactors in the HVAC systems for improved noise control solutions.

The Hyatt Place in Sugar Land teamed up with Letsos Mechanical and HTS Texas to control their high-humidity climate conditions. For example, when Hyatt built the 214-room Hyatt Place hotel and conference center, HTS Texas proposed a design using specialized dehumidifying HVAC equipment which included more than 222 fan coil units and two large McQuay roof top units, allowing the hotel to dehumidify outside air before bringing it inside the building.

The AVIA Hotel in The Woodlands also teamed up with Gray Mechanical and HTS Texas to provide their facility with an energy-efficient HVAC system that will allow guests to truly escape into a tranquil environment. An environment that HTS Texas’ innovative, dehumidifying HVAC equipment and controls helped to create.

Embassy Suites relied on Comfort Systems USA and HTS Texas for two installations in their new downtown and Energy Corridor locations. For the 60,000 square foot Embassy Suites hotel located in downtown Houston, HTS Texas provided 262 Enviro-Tec Hi-Rise vertical fan coils, 58 Enviro-Tec horizontal

blower coils and one McQuay Destiny air handler. The Energy Corridor location in west Houston called for intelligent, energy-efficient HVAC equipment that would provide the hotel savings during unoccupied periods and optimal comfort cooling and heating when occupied. The installation included two McQuay air cooled chillers, two Addison roof-top units and 230 Hi-Rise vertical fan coils and 18 various blower coils from Enviro-Tec.

The centerpiece of Houston’s CITYCENTRE mixed-use urban development, Hotel Sorella sports 224 guest rooms and 22 luxury penthouse residences that Gray Mechanical and HTS Texas outfitted with McQuay RTUs, air handling units, and 225 Enviro-Tec fan coil units. Additionally, HTS provided an 800-ton McQuay water cooled chiller and a full turn-key HVAC digital controls system manufactured by Siemens to ensure guests keep their cool after a long day of dining and shopping experiences.

Finally, HTS Texas enjoys a long-standing working relationship with Drury Southwest Inc., having completed more than 20 Drury Inn hotel projects to date throughout the Southwestern U.S. HTS Texas is also providing HVAC products and services for six additional Drury Inn hotel properties recently being built or under construction currently in San Antonio, Austin, New Orleans, Wichita and Cape Girardeau, Missouri.

About HTS

With nearly 300 employees, HTS has offices in 16 cities across the U.S. and Canada, representing more than 70 HVAC suppliers. Delivering Real Success to all involved in its projects, HTS provides HVAC, heat transfer and refrigeration solutions to the commercial, institutional, residential and industrial markets and represents leading manufacturers such as Daikin AC, McQuay International and Haakon Industries. For more information about HTS Texas, log on to www.htseng.com or http://texas.htseng.com.

Related Stories

Hotel Facilities | Apr 25, 2022

U.S. hotel construction pipeline up 2%, with 5,090 projects in the works

The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE). 

Codes and Standards | Apr 25, 2022

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.

Sports and Recreational Facilities | Apr 25, 2022

Iowa's Field of Dreams to get boutique hotel, new baseball fields

A decade ago, Go the Distance Baseball formed to preserve the Iowa farm site where the 1989 movie Field of Dreams was filmed. 

Building Team | Apr 22, 2022

EarthCam Adds Senior Leadership Roles to Facilitate Rapid Growth

EarthCam today announced several new leadership positions as it scales up to accommodate increasing demand for its webcam technology and services.

Architects | Apr 22, 2022

Top 10 green building projects for 2022

The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.

Mixed-Use | Apr 22, 2022

San Francisco replaces a waterfront parking lot with a new neighborhood

A parking lot on San Francisco’s waterfront is transforming into Mission Rock—a new neighborhood featuring rental units, offices, parks, open spaces, retail, and parking.

Legislation | Apr 21, 2022

NIMBYism in the Sunbelt stymies new apartment development

Population growth in Sunbelt metro areas is driving demand for new apartment development, but resistance is growing against these projects.

Architects | Apr 21, 2022

A conversation with architect Robert A.M. Stern

The architect Robert A.M. Stern discusses his newly published memoir that touches on his childhood in New York and 50-plus-year career.

Building Team | Apr 20, 2022

White House works with state, local governments to bolster building performance standards

The former head of the U.S. Green Building Council says the Biden Administration’s formation of the National Building Performance Standards Coalition is a “tremendous” step in the right direction to raise building performance standards in the U.S.

Market Data | Apr 20, 2022

Pace of demand for design services rapidly accelerates

Demand for design services in March expanded sharply from February according to a new report today from The American Institute of Architects (AIA).  

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021