flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospitality industry turns to HTS Texas for ‘do not disturb’ air conditioned comfort

Hospitality industry turns to HTS Texas for ‘do not disturb’ air conditioned comfort


March 17, 2011

HOUSTON (March 17, 2011) – Large resort hotels and hospitality properties throughout the Southwest have been working with local contractors, engineers and HTS Texas for the latest innovations in quiet heating, ventilating and air conditioning (HVAC) equipment, so hotel guests can rest easily while hotel management enjoys the savings of the latest in energy-efficient technology. The company has completed 12+ projects throughout Texas and the Southwestern U.S. over the past 18 to 24 months, and is currently working on six more hotel projects throughout the region.

From Houston to San Antonio and Austin, Texas to Wichita, Kansas, HTS Texas has supplied water- and air-cooled chiller systems, air-handling units, fan coil units, specialty dehumidifying equipment and other large-scale HVAC systems to provide hotels energy savings with a focus on using noise management “do not disturb” control systems for optimal guest experience. Recent projects include properties for JW Marriott, Hyatt, Embassy Suites, Doubletree Hotels, AVIA Hotel, Westin Galleria, Westin Oaks, Hotel Sorella, Drury Inn, Omni, and other private hotels and resort properties.

“HTS Texas has extensive experience in the hotel and resort industry,” noted HTS Texas Founder and Principal Mike Donovan. “The hospitality industry looks for quality, reliability and energy efficiency, as well as guest comfort when selecting the required large-scale HVAC solutions needed for these properties. Part of a quality guest experience includes a peaceful, good night’s sleep, which shouldn’t be interrupted when HVAC systems switch on and off. Hotel guests should enjoy a comfortable interior climate without giving a second thought about the equipment creating their comfort.”

Among recent projects, HTS Texas’ expertise with vertical stacked fan coil units was tapped for JW Marriott’s newly built 1.1 million square foot, 1,000 room hotel and resort facility outside San Antonio. Working with architects, contractors and engineers for more than two years, HTS Texas provided approximately 1,024 Enviro-Tec vertical stacked fan coil units for the project, as well as variable air volume and fan-powered boxes to support seven hotel zones, the conference center and spa.            HTS Texas also added low sound fan and unit construction and silent contactors in the HVAC systems for improved noise control solutions.

The Hyatt Place in Sugar Land teamed up with Letsos Mechanical and HTS Texas to control their high-humidity climate conditions. For example, when Hyatt built the 214-room Hyatt Place hotel and conference center, HTS Texas proposed a design using specialized dehumidifying HVAC equipment which included more than 222 fan coil units and two large McQuay roof top units, allowing the hotel to dehumidify outside air before bringing it inside the building.

The AVIA Hotel in The Woodlands also teamed up with Gray Mechanical and HTS Texas to provide their facility with an energy-efficient HVAC system that will allow guests to truly escape into a tranquil environment. An environment that HTS Texas’ innovative, dehumidifying HVAC equipment and controls helped to create.

Embassy Suites relied on Comfort Systems USA and HTS Texas for two installations in their new downtown and Energy Corridor locations. For the 60,000 square foot Embassy Suites hotel located in downtown Houston, HTS Texas provided 262 Enviro-Tec Hi-Rise vertical fan coils, 58 Enviro-Tec horizontal

blower coils and one McQuay Destiny air handler. The Energy Corridor location in west Houston called for intelligent, energy-efficient HVAC equipment that would provide the hotel savings during unoccupied periods and optimal comfort cooling and heating when occupied. The installation included two McQuay air cooled chillers, two Addison roof-top units and 230 Hi-Rise vertical fan coils and 18 various blower coils from Enviro-Tec.

The centerpiece of Houston’s CITYCENTRE mixed-use urban development, Hotel Sorella sports 224 guest rooms and 22 luxury penthouse residences that Gray Mechanical and HTS Texas outfitted with McQuay RTUs, air handling units, and 225 Enviro-Tec fan coil units. Additionally, HTS provided an 800-ton McQuay water cooled chiller and a full turn-key HVAC digital controls system manufactured by Siemens to ensure guests keep their cool after a long day of dining and shopping experiences.

Finally, HTS Texas enjoys a long-standing working relationship with Drury Southwest Inc., having completed more than 20 Drury Inn hotel projects to date throughout the Southwestern U.S. HTS Texas is also providing HVAC products and services for six additional Drury Inn hotel properties recently being built or under construction currently in San Antonio, Austin, New Orleans, Wichita and Cape Girardeau, Missouri.

About HTS

With nearly 300 employees, HTS has offices in 16 cities across the U.S. and Canada, representing more than 70 HVAC suppliers. Delivering Real Success to all involved in its projects, HTS provides HVAC, heat transfer and refrigeration solutions to the commercial, institutional, residential and industrial markets and represents leading manufacturers such as Daikin AC, McQuay International and Haakon Industries. For more information about HTS Texas, log on to www.htseng.com or http://texas.htseng.com.

Related Stories

| Feb 18, 2014

Illinois leads Top 10 states for LEED in annual USGBC ranking

The U.S. Green Building Council has released its ranking of the Top 10 States for LEED, the world’s most widely used and recognized green building rating system.

| Feb 18, 2014

Study: 90% of healthcare providers say Affordable Care Act is 'step forward,' but major revisions needed

Providers are excited about opportunities to address long-term health issues in the U.S., but worries about the transition persist, according to a new study by Mortenson Construction.

| Feb 17, 2014

SmithGroupJJR President and CEO Carl Roehling appointed to serve on the AIA/AGC Joint Committee

Carl Roehling, FAIA, LEED AP BD+C, president & CEO of SmithGroupJJR, has been appointed to serve on the Joint Committee of The American Institute of Architects (AIA) and The Associated General Contractors of America (AGC).

| Feb 17, 2014

Developer plans to 'crowdfund' extended stay hotel in Manhattan

Want to own a piece of Manhattan hotel real estate? Developer Rodrigo Nino is inviting individual investors to put up $100,000 each for his latest project, 17 John. 

| Feb 17, 2014

Call for Entries: 17th annual Building Team Awards - Deadline Extended!

BD+C's Building Team Awards is the industry's only recognition program to honor projects that achieve excellence in both design/construction and collaboration of the AEC/O team. The deadline has been extended to March 14, 2014.

| Feb 17, 2014

GBI to Offer AIA Approved Course Free for 60 Days to Train New Green Globes Professionals

The Green Building Initiative™ (GBI) announced today that between Feb. 13 and April 15 it will provide free access to its online certification course for Green Globes Professionals™ (GGPs). GGPs help guide building projects in achieving Green Globes® ratings, awarded for environmentally-focused design and construction.

| Feb 14, 2014

ASHRAE, Green Grid team up on energy-efficiency guide for data centers

Vendor-neutral publication examines aspects of the popular power usage effectiveness (PUE) metric.

| Feb 14, 2014

Scrap tires used to boost masonry blocks at Missouri University of S&T

Research could lead to blocks that use waste material and have seismic and insulating benefits.

| Feb 14, 2014

Giant interactive pinwheel adds fun to museum exterior

The proposed design for the Santa Cruz Museum of Art and History features a 10-foot pinwheel that can be activated by passersby.

| Feb 14, 2014

First look: Kentucky's Rupp Arena to get re-clad as part of $310M makeover

Rupp Arena will get a 40-foot high glass façade and a new concourse, but will retain many of its iconic design elements.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021