flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospitals’ fossil fuel use trending downward, but electricity use isn’t declining as much

Codes and Standards

Hospitals’ fossil fuel use trending downward, but electricity use isn’t declining as much

Energy and water benchmarking study finds average carbon footprint remaining fairly steady.


By Peter Fabris, Contributing Editor | June 14, 2022
Hospital building
Courtesy Pixabay.

The 2021 Hospital Energy and Water Benchmarking Survey by Grumman|Butkus Associates found that U.S. hospitals’ use of fossil fuels is declining since the inception of the annual survey 25 years ago, but electricity use is dipping more slowly.

The average combined Btu/ft2 (electricity plus gas/steam) for participating facilities was 236,743 in this year’s survey, up from 233,491 in 2019. “However, interpretation of year-to-year trends should be tempered by the realization that the respondent pool for the 2021 survey was different from the pool from the 2020 edition, due to the stresses that COVID-19 response placed on the healthcare facility personnel who normally participate, particularly during 2019,” according to a news release.

Hospitals’ average carbon footprint has remained fairly steady at 50 to 60 pounds of CO2 equivalent per square foot per year since GBA began calculating carbon data in 1999. CO2 footprint in 2020 was up from a low in 2019 (likely attributable to a change in respondents for the 2020 survey), but still shows an 18% decrease from 2018.

“To meet the ambitious goals put forth by the Biden Administration, hospitals will have to achieve much more significant reductions in the near term,” says GBA-Illinois Chairman Dan Doyle. “These reductions can only be achieved by implementing larger and more costly retrofits of existing buildings.

“The drive to decarbonize will also require building owners to embrace fuel switching to renewable-based energy sources. Many leading healthcare systems are implementing on-site renewables (usually solar photovoltaic systems), as well as off-site renewables, often funded through Power Purchase Agreements (PPA) to purchase some or all of their electricity.”

Related Stories

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

Codes and Standards | Nov 26, 2018

All LEED-certified buildings eligible for LEED recertification

Projects must submit 12 months of data demonstrating continued or improved performance.

Codes and Standards | Nov 20, 2018

OSHA publishes updates to crane operator certification requirements

Long-delayed rules accept certifications by type or type and capacity.

Codes and Standards | Nov 19, 2018

Guide offers understanding of elements that create successful multi-floor communal spaces

CTBUH technical document analyzes how to approach tall urban habitat.

Codes and Standards | Nov 16, 2018

2018 International Green Construction Code released

Updated version helps governments streamline code development and adoption.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021