flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel construction pipeline hits five-year high

Hotel construction pipeline hits five-year high

Year-over-year increases for projects and rooms were up 25% and 24%, respectively, in the third quarter.


By BD+C Staff | November 10, 2014
A Marriott hotel in Orlando, Fla. Marriott is leading the U.S. hotel pipeline. P
A Marriott hotel in Orlando, Fla. Marriott is leading the U.S. hotel pipeline. Photo credit: Timjarrett, Wikimedia Commons

The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports.

For four consecutive quarters, the pipeline has posted double-digit year-over-year increases in terms of both projects and rooms. In Q3, year-over-year increases for projects and rooms are up 25% and 24%, respectively.

Conditions are currently favorable for developers, according to the report. This year is the fifth consecutive year that the growth of guest room demand has exceeded supply growth; supply growth has been 1.3% for four consecutive years.

Making the outlook even rosier for developers: occupancy will reach a 17-year high by the end of 2014. Average rate and revenue per available room will also reach record highs at year-end, according to the report.

Other report highlights:
• 23 of the top 25 markets are running above the nation’s average occupancy rate of 65.9%
• New York, with 176 projects and 29,775 rooms, has the largest pipeline in the country
• Houston, Washington, D.C., Los Angeles, and Miami are the next largest pipelines
• The brand at the head of the pipeline is Marriott International, followed by Hilton and Intecontinental

Read more or order a full report here.

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021