The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports.
For four consecutive quarters, the pipeline has posted double-digit year-over-year increases in terms of both projects and rooms. In Q3, year-over-year increases for projects and rooms are up 25% and 24%, respectively.
Conditions are currently favorable for developers, according to the report. This year is the fifth consecutive year that the growth of guest room demand has exceeded supply growth; supply growth has been 1.3% for four consecutive years.
Making the outlook even rosier for developers: occupancy will reach a 17-year high by the end of 2014. Average rate and revenue per available room will also reach record highs at year-end, according to the report.
Other report highlights:
• 23 of the top 25 markets are running above the nation’s average occupancy rate of 65.9%
• New York, with 176 projects and 29,775 rooms, has the largest pipeline in the country
• Houston, Washington, D.C., Los Angeles, and Miami are the next largest pipelines
• The brand at the head of the pipeline is Marriott International, followed by Hilton and Intecontinental
Read more or order a full report here.
Related Stories
| Sep 16, 2010
Gehry’s Santa Monica Place gets a wave of changes
Omniplan, in association with Jerde Partnership, created an updated design for Santa Monica Place, a shopping mall designed by Frank Gehry in 1980.
| Sep 16, 2010
Green recreation/wellness center targets physical, environmental health
The 151,000-sf recreation and wellness center at California State University’s Sacramento campus, called the WELL (for “wellness, education, leisure, lifestyle”), has a fitness center, café, indoor track, gymnasium, racquetball courts, educational and counseling space, the largest rock climbing wall in the CSU system.
| Sep 13, 2010
Community college police, parking structure targets LEED Platinum
The San Diego Community College District's $1.555 billion construction program continues with groundbreaking for a 6,000-sf police substation and an 828-space, four-story parking structure at San Diego Miramar College.
| Sep 13, 2010
Campus housing fosters community connection
A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Sep 13, 2010
Palos Community Hospital plans upgrades, expansion
A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.
| Sep 13, 2010
China's largest single-phase hospital planned for Shanghai
RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.
| Sep 13, 2010
Richmond living/learning complex targets LEED Silver
The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.