Lendlease and IHG Army Hotels, which is part of the InterContinental Hotels Group, were the first to build a hotel using cross-laminated timber (CLT) in the U.S., constructed in the former troop barracks area at Redstone Arsenal in Alabama and opened in March 2016. That team recently completed its fourth CLT hotel, the first phase of the Candlewood Suites at Fort Jackson in South Carolina, which opened last month.
The first phase consists of this property’s 171-room West Building whose construction included some 4,100 pieces of black spruce CLT. The property’s East building, slated to be completed next spring, will have 146 rooms. The costs of these projects were not disclosed.
Lendlease and IHG Army Hotels have a portfolio of hotels with an aggregate 13,000-plus rooms, located on 40 U.S. military installations. This portfolio includes the largest Candlewood Suites hotel in the world, a 311-room facility that opened last July in Fort Gordon, Ga. The South Carolina project was developed under the Privatization of Army Lodging (PAL) program, and is the 14th Candlewood Suites hotel in the PAL portfolio. Lendlease and IHG Army Hotels took over operations of Fort Jackson’s lodging in 2013.
The $1.8 billion PAL program’s total construction costs to date exceed $940 million.
Also see: Time-lapse video of the Fort Jackson hotel’s construction
P3 AGREEMENT DATES BACK MORE THAN 10 YEARS
In 2009, Lendlease took ownership of more than 3,200 hotel rooms located across 10 U.S. Army installations and, with IHG, became the first developer to begin operations under PAL, an Army-led public-private partnership that was established to revitalize on-post lodging for soldiers, their families and government travelers. Under this program, Lendlease and IHG have also built hotels branded Holiday Inn Express and Staybridge Suites.
Lendlease, PAL’s executive developer under an agreement with the U.S. Department of Defense, is owner/developer, design/builder, and asset manager on the Fort Jackson hotel. InterContinental Hotels Group is the operator and manager of IHG Army Hotels.
“The PAL program is a great partnership [among] the Army, Lendlease, and IHG,” stated Scott Chamberlain, Acting Deputy Assistant Secretary of the Army for Installations, Housing, and Partnerships. “I look forward to ongoing success as we continue to meet the mission of the PAL program by improving the quality of life for service members and their families.
Each of the rooms includes a kitchenette among its amenities.
MAJOR INVESTMENTS IN HOUSING, AFTER MANAGEMENT FLAWS EXPOSED
Stars and Stripes reported last month that the Army plans to spend $2.8 billion in base housing over the next five years to build 3,800 new homes and renovate nearly 18,000 existing homes at Army bases. This announcement followed reports about dangerous housing conditions that include exposure to lead paint, mold and asbestos; insect infestation, and poor maintenance.
Military officials attribute some of these problems to poor oversight of private companies that manage nearly all the housing on stateside bases.
This latest investment would build on a $500 million base housing investment last fall, according to Army Secretary Ryan McCarthy.
Related Stories
Giants 400 | Sep 9, 2022
Top 80 Hotel Sector Contractors + CM Firms for 2022
AECOM, Suffolk Construction, STO Building Group, and Swinerton top the ranking of the nation's largest hotel and resort sector contractors and construction management (CM) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Sep 9, 2022
Top 70 Hotel Sector Engineering + EA Firms for 2022
Jensen Hughes, Jacobs, WSP, and Kimley-Horn top the ranking of the nation's largest hotel and resort sector engineering and engineering/architecture (EA) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Sep 8, 2022
Top 115 Hotel Sector Architecture + AE Firms for 2022
Gensler, WATG, HKS, and Stantec top the ranking of the nation's largest hotel and resort sector architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Aug 19, 2022
2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms
Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories.
Hotel Facilities | Aug 12, 2022
Denver builds the nation’s first carbon-positive hotel
Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver.
Hotel Facilities | Jul 28, 2022
As travel returns, U.S. hotel construction pipeline growth follows
According to the recently released United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the total U.S. construction pipeline stands at 5,220 projects/621,268 rooms at the close of 2022’s second quarter, up 9% Year-Over-Year (YOY) by projects and 4% YOY by rooms.
Hotel Facilities | May 31, 2022
Checking out: Tips for converting hotels to housing
Many building owners are considering repositioning their hotels into another property type, such as senior living communities and rental apartments. Here's advice for getting started.
Sponsored | Multifamily Housing | May 8, 2022
Choosing the right paver system for rooftop amenity spaces
This AIA course by Hoffmann Architects offers best practices for choosing the right paver system for rooftop amenity spaces in multifamily buildings.
Sponsored | BD+C University Course | May 3, 2022
For glass openings, how big is too big?
Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.
Hotel Facilities | Apr 25, 2022
U.S. hotel construction pipeline up 2%, with 5,090 projects in the works
The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE).