flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel project pipeline up 5% in January

Hotel project pipeline up 5% in January

Luxury leads the segment, followed by upscale


By BD+C Staff | February 15, 2013
Luxury and upscale projects lead the increase in hotel construction and planning
Luxury and upscale projects lead the increase in hotel construction and planning.

According to the January 2013 STR Pipeline Report, the total active U.S. hotel development pipeline comprises 2,637 projects totaling 307,289 rooms. 

This represents a 4.9% increase in the number of rooms in the total active pipeline compared with January 2012, and a 38.3% increase in rooms under construction. The total active pipeline data includes projects in the construction, final planning, and planning stages but does not include projects in the pre-planning stage.

"Under construction rooms continue their steady climb, increasing about 7% from last month and more than 38% versus January 2012," said Bobby Bowers, Senior VP of Operations at STR. "Upscale and Upper Midscale brand dominance continues, accounting for almost 63% of rooms that have broken ground. Additionally, Luxury rooms under construction are up significantly from January 2012, perhaps reflecting confidence in the industry's sustained upward momentum. We expect supply growth to continue inching forward in 2013, with full year net growth of around 1%."

Among the Chain Scale segments, the Luxury segment reported the largest increase in rooms in the total active pipeline, rising 96.8% with 7,940 rooms, followed by the Upscale segment with a 10.7% increase to 82,412 rooms. Three markets reported double-digit decreases in the number of rooms in the total active pipeline: Upper Upscale segment (-22.5% with 15,339 rooms); the Midscale segment (-17.9% with 19,530 rooms); and the Economy segment (-11.2% with 4,002 rooms).

(http://www.worldpropertyjournal.com/north-america-vacation-news/us-hotel-development-pipeline-str-pipeline-report-new-hotels-under-construction-bobby-bowers-6527.php)

Related Stories

Hotel Facilities | Nov 7, 2019

New London aparthotel is made entirely from shipping containers

Doone Silver Kerr designed the project.

Hotel Facilities | Oct 22, 2019

Modular, collapsable hotel pods can be built in cities’ interstitial spaces

Connectic by Cooper Carry recently won the 2019 Radical Innovation Award.

Hotel Facilities | Sep 24, 2019

A series of glass ‘igloos’ create the world’s northernmost hotel

Luxury Action, a private travel company, is behind the project.

Giants 400 | Sep 5, 2019

Top 85 Hotel Sector Construction Firms for 2019

Suffolk, Yates Companies, AECOM, Swinerton, and Turner top the rankings of the nation's largest hotel sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Sep 5, 2019

Top 70 Hotel Sector Engineering Firms for 2019

NV5, EXP, Jensen Hughes, KPFF, and Thornton Tomasetti head the rankings of the nation's largest hotel sector engineering and engineering architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Sep 5, 2019

Top 110 Hotel Sector Architecture Firms for 2019

Gensler, WATG, HKS, HBG Design, and Steelman Partners top the rankings of the nation's largest hotel sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

AEC Innovators | Aug 13, 2019

Stacking the deck: Marriott International embraces modular construction

The hotel giant has more than 50 projects in the works that incorporate prefab guestrooms or bathrooms.

Hotel Facilities | Jul 31, 2019

Hotels are taking steps to curtail their energy and water appetites

But owners and operators must be on the same page to achieve meaningful sustainability, says a new ULI report.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021