According to the January 2013 STR Pipeline Report, the total active U.S. hotel development pipeline comprises 2,637 projects totaling 307,289 rooms.
This represents a 4.9% increase in the number of rooms in the total active pipeline compared with January 2012, and a 38.3% increase in rooms under construction. The total active pipeline data includes projects in the construction, final planning, and planning stages but does not include projects in the pre-planning stage.
"Under construction rooms continue their steady climb, increasing about 7% from last month and more than 38% versus January 2012," said Bobby Bowers, Senior VP of Operations at STR. "Upscale and Upper Midscale brand dominance continues, accounting for almost 63% of rooms that have broken ground. Additionally, Luxury rooms under construction are up significantly from January 2012, perhaps reflecting confidence in the industry's sustained upward momentum. We expect supply growth to continue inching forward in 2013, with full year net growth of around 1%."
Among the Chain Scale segments, the Luxury segment reported the largest increase in rooms in the total active pipeline, rising 96.8% with 7,940 rooms, followed by the Upscale segment with a 10.7% increase to 82,412 rooms. Three markets reported double-digit decreases in the number of rooms in the total active pipeline: Upper Upscale segment (-22.5% with 15,339 rooms); the Midscale segment (-17.9% with 19,530 rooms); and the Economy segment (-11.2% with 4,002 rooms).
Related Stories
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 28, 2014
Welcome to the Hive: OVA designs wild shipping container hotel for competition
Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 15, 2014
First look: Zaha Hadid reveals designs for dreamy sculptural hotel - CORRECTED
Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub, features a latticed exoskeleton enveloping the building's exterior. The 40-floor, 150,000-square-foot space is envisioned as a monolith with voids carved throughout.
| Apr 11, 2014
Start your engines: Ferrari plans to build first ever hotel
Clad in the carmaker's signature "Ferrari red," the hotel will resemble the grill and hood of one of its iconic cars.
| Apr 9, 2014
5 important trends shaping today’s hotel construction market
AEC firms, developers, and investors worldwide are bullish on hotels. Our hospitality Giants share what’s new in this fast-morphing sector.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]
Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.
| Apr 8, 2014
First look: Zaha Hadid reveals design for dreamy sculptural hotel
Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub in Macau, features a latticed exoskeleton enveloping the building's exterior.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.