flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

How does your firm’s hit rate stack up to the AEC competition?

Building Team

How does your firm’s hit rate stack up to the AEC competition?

If your firm is not converting at least a third of project proposals when competing for new work, it may be time to reassess your marketing tactics and processes.


By BD+C Staff | January 3, 2017

Photo: Pixabay

New research from the Society for Marketing Professional Services Foundation (SMPS Foundation) finds that average AEC firm hit rate—measured most commonly as the total number of proposals submitted to the total number of projects won—falls within the 37-44% range, depending on the discipline. Engineering firms have the highest average hit rate, at 44.2%. Construction firms have the lowest average hit rate, at 37.9%.

The 22-page report, Measuring for Success: A Look at Hit Rates & Other KPIs in the A/E/C Industries, evaluates the tools and processes that AEC firms use to track marketing success. The findings and analysis are based on a survey of 303 U.S.-based AEC firms conducted by the SMPS Foundation in conjunction with the Southern Illinois University Edwardsville Master of Marketing Research program.

“While there are many variables in tracking hit rates throughout AEC industries, there is a benefit to having a metric for evaluating a firm’s progress,” wrote the report’s authors. “The hit rate provides a baseline over time for firms to improve their success rate and should be used in conjunction with other key performance indicators such as profitability, market trends, and backlog.”

The report addresses a variety of topics, including:
• Methods and metrics AEC firms utilize to track their success of winning projects
• How firms use the hit rate metric to improve future performance
• Alternative key performance indicators
• Effectiveness of hit rate and other KPIs
• Barriers to developing a benchmarking standard for AEC firms
• It concludes with takeaways and action steps for AEC firms.

SMPS members receive a complimentary download of the report once they log on to smps.org.

Nonmembers may download the report with a donation of $24.95 until January 31, 2017.

Source: SMPS Foundation

 

 

Related Stories

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Boral Bricks announces winners of “Live.Work.Learn” student architecture contest

Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 8, 2012

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 23, 2012

Vegas’ CityCenter called financial ‘black hole’

Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021