How to prevent corrosion in sprinkler system piping

Codes and Standards

How to prevent corrosion in sprinkler system piping

The technical committees responsible for NFPA 13, Installation of Sprinkler Systems, have been looking at ways to eliminate or reduce corrosion in sprinkler systems for several revision cycles.


By Peter Fabris, Contributing Editor | June 18, 2015
How to prevent corrosion in sprinkler system piping

Image: Pixabay

Corrosion in sprinkler system piping can be a costly problem if leaks occur, causing damage to the interior of a structure, according to Matt Klaus, Principal Fire Protection Engineer with the National Fire Protection Association. 

Replacing piping is no small expense, either. Corrosion can also cause blockages in the piping network, which can lead to an ineffective sprinkler system during a fire.

Corrosion can take on many forms, including oxidation, microbiologically influenced corrosion, and galvanic corrosion. The technical committees responsible for NFPA 13, Installation of Sprinkler Systems, have been looking at ways to eliminate or reduce corrosion in sprinkler systems for several revision cycles.

Reducing corrosion in dry systems can be achieved by eliminating all of the water from these systems after testing/activation and using alternative gases like nitrogen for charging these systems. For wet systems, limiting the amount of air in the system is the goal. Air trapped in pressurized sprinkler system piping results in an increase in the concentration of dissolved oxygen in the piping, enabling corrosion. Venting the trapped air in a wet system reduces this problem, so a revision to the wet system sprinkler system standard requires that a single air vent be installed for each system.

Depending upon the building geometry and sprinkler design, it is possible to trap air in many locations in the system, meaning a single vent may not be effective. Therefore, some stakeholders believe that the requirement adds cost to the property owner and the design team without any assurance that there is a long-term benefit to the system.

More tips and advice from the NFPA.

Related Stories

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

Codes and Standards | Jan 7, 2020

New certification program for rigid core luxury vinyl tile

ASSURE CERTIFIED to establish industry-wide quality standards.

Codes and Standards | Jan 7, 2020

Boston’s beefed up wetlands ordinance will limit development

Conservation commission must consider future climate impacts when assessing new projects.

Codes and Standards | Jan 6, 2020

States pick up the slack in efficiency policy as federal government lags

With climate change deniers setting policy in Trump Administration, progress continues in statehouses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021