flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HUD releases new Fair Housing Act design and construction requirements

Codes and Standards

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.


By Peter Fabris, Contributing Editor | January 11, 2021

Courtesy Pixabay

The U.S. Department of Housing and Urban Development (HUD) has adopted five new safe harbors for new multifamily housing projects.

These safe harbors apply to instances where there are conflicts between applicable code and FHA requirements. Safe harbors often lag behind new codes and standards, so these updates should reduce confusion for architects and contractors.

Usually, where there is a conflict between an FHA requirement and applicable code, the most stringent requirement takes precedence. There are instances, though, where there is a conflict with neither requirement being more stringent than the other.

Safe harbors provide guidance to the design and construction industry to sort out such conflicts. A safe harbor must be applied by the entire design and construction team in order to establish that the housing project complies with FHA requirements.

To stay current with new versions of codes, HUD changed its rulemaking requirements on how and when it can adopt new safe harbors. Now, the department may propose a new safe harbor by Federal Register notice with a 30-day public comment period. This will allow HUD to more quickly adopt updated standards and prevent conflicts between FHA requirements and codes.

Related Stories

| Jul 5, 2012

Roof membrane could have prevented roof parking deck collapse, specialist says

The collapse of a section of a roof parking deck at the Algo Centre Mall in Elliot Lake in Ontario, Canada could have been prevented if the structure had a membrane, according to a concrete expert and specialist in structure analysis at McMaster University.

| Jul 5, 2012

New Joplin, Mo. hospital being built to withstand tornado that destroyed predecessor

After the May 22, 2011, EF-5 tornado destroyed St. John’s Regional Medical Center in Joplin, Mo., architects and engineers analyzed how the nine-story structure reacted to the storm.

| Jul 5, 2012

Continued tax breaks necessary for widespread adoption of net zero buildings

Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

| Jun 28, 2012

Label for building products will have ‘global warming number’

The director of the 2030 Challenge for Products says that the organization is aiming to place a label on building products that will list what’s in it, and how much embodied carbon each product represents.

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021