This 16-month repositioning effort in Manhattan’s Midtown West neighborhood converted a nine-story, 1960s warehouse into an amenity-rich, Class A office tower near one of the city’s hottest districts: Hudson Yards. The project team, led by Cove Property Group, Kohn Pedersen Fox, and Pavarini McGovern, nearly tripled the height of the existing structure, adding 17 stories atop the podium building. This structural feat was accomplished by reinforcing the building’s foundation through several measures:
• A 48-inch-thick spread footing was poured using more than 330 cubic yards of concrete in a single pour—enough to cover an NHL ice rink with a six-inch slab.
• A shearwall, rock anchors, and micropiles were added to the foundation structure.
• More than 200 existing columns were strengthened with concrete “jackets,” using a cylindrical rebar cage and shotcrete.
• Existing cast-in-place floor slabs were tied to the new core as it was constructed up the building, allowing a seamless load transfer through the existing diaphragm to the new core.
The original nine-story EmblemHealth building (at left). The Pavarini McGovern-led team added 17 stories to create Hudson Commons, 441 Ninth Avenue in Manhattan.
To bring natural light into the dark industrial structure, the design team added a glass storefront on the ground floor and expanded the existing ribbon windows vertically by 18 inches. The additional vision glass, combined with the 14-foot, four-inch slab-to-slab heights, brought ample light deep into the 50,000-sf floor plates.
The new structure features an all-glass façade with 14-foot floor-to-floor heights. Its side-core configuration creates efficient floor plates and preserves views of the city and the Hudson River to the west. Nearly every level features private terraces or balconies. The top floor combines double-height space with a private landscaped terrace.
Since opening last May, Hudson Commons has attracted several big-name tenants, including Lyft and Peloton, which chose to relocate its corporate headquarters there. Currently, 453,000 sf of space is leased (65% of leasable space) in the LEED Platinum–registered building.
The Reconstruction Awards judges praised the project team for its creative, meticulous structural solutions. The end product, said one judge, is “well done in a simple, restrained expression.”
BRONZE AWARD WINNER
BUILDING TEAM Pavarini McGovern (submitting firm, GC) Cove Property Group (owner, developer) Kohn Pedersen Fox Associates (architect) Gensler (interior architect) WSP Parsons Brinkerhoff (SE) Cosentini Associates (MEP) DETAILS 700,000 sf Total cost Confidential at client’s request Construction time January 2018 to May 2019 Delivery method CM at risk
Related Stories
Reconstruction Awards | Nov 11, 2016
Exclusive Chicago club re-emerges as a boutique hotel
Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.
Reconstruction Awards | Dec 1, 2015
Massive Chicago parking garage gets overdue waterproofing
Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.
Reconstruction Awards | Nov 30, 2015
Washington Monument restored after 2011 East Coast earthquake
This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.
Reconstruction Awards | Nov 30, 2015
Denver's 107-year-old seminary campus modernized
The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.
Reconstruction Awards | Nov 24, 2015
Center of I.M. Pei-designed plaza part of Washington redevelopment
The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.
Reconstruction Awards | Nov 24, 2015
Manhattan's first freestanding emergency department a result of adaptive reuse
The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.
Reconstruction Awards | Nov 19, 2015
Nave restored at Yale’s Sterling Memorial Library
Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.
Reconstruction Awards | Nov 19, 2015
Infinite Chicago redevelopment bridges past to present
The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.
Reconstruction Awards | Nov 18, 2015
Sun Theater serves the youth of St. Louis
Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.
Reconstruction Awards | Nov 17, 2015
Smithsonian Institution’s Arts and Industries Building again an exposition and museum space
After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.