Hunt Midwest, a Kansas City-based commercial real estate company, kicked off its expansion into the Greenville-Spartanburg, S.C., market with the speculative development of the 476,280-sf Fort Prince Logistics Center, located on 47 acres in the master planned Fort Prince Industrial Park in Lyman, S.C., 11 miles west of Spartanburg.
The project, which is already under construction, is scheduled for completion in the fourth quarter of this year. The Building Team includes Seamon Whiteside (CE), LS3P (building design), and Evans General Contractors (GC). Colliers is handling the leasing.
FLEXIBLE DESIGN
The Logistics Center will open with 189 parking stalls, expandable to 385. There will be a 135-ft-deep truck court and up to 125 tractor trailer parking stalls. The building’s features include 48 dock positions (expandable to 117) with 36-ft-high clearances, mechanical dock equipment, 7-inch-thick concrete slab flooring, and ESRF sprinkler system, and motion-sensor LED lighting.
Hunt Midwest is deploying design-build project delivery “to lock in construction costs,” and allow for “maximum flexibility for logistics, manufacturing, and distribution users,” said Tony Borchers, Hunt Midwest’s Vice President of Acquisitions and Development, in a prepared statement. (The company did not disclose the cost of this project.)
The Logistics Center will have access to Interstate 85 (which connects to Charlotte and Atlanta), South Carolina’s Inland Port Greer, and GSP International Airport. It will be near BMW’s plant and adjacent to a $450 million, 720,000-sf Walmart distribution center for fresh and frozen groceries that’s scheduled to open in 2024.
A SOUGHT-AFTER MARKET
Michael Bell, Hunt Midwest’s Vice President of Commercial Real Estate, said his company was drawn to the Greenville-Spartanburg market by the state’s “highly skilled labor force,” as well as the new facility’s proximity to FedEx that “will greatly benefit a diverse group of tenants.”
Another developer, Rockefeller Group, is about to break ground in Greenville/Spartanburg on Duncan Logistics Center, a three-building development totaling 827,000 sf that MCA Architects designed and Harper General Contractors will build in two phases.
Hunt Midwest is part of the Lamar Hunt family of businesses, and has $1.5 billion and 2,500-plus acres of development projects in Kansas City and Dallas-Fort Worth. Last summer, the company completed its first industrial project outside of Kansas City, the $22 million 322,831-sf Blankenbaker Logistics Center in Louisville, Ky., which is fully leased to Piston Automotive. Hunt MIdwest has plans to expand further into the Southeastern region of the U.S.
Related Stories
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Frames: the biggest value engineering tip
In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.