Drake elementary school was one of 47 elementary schools decommissioned by Chicago Public Schools in 2014, due to declining student enrollment. The building, constructed in the 1960s in the Bronzeville neighborhood, south of the Loop, attracted the interest of International Brotherhood of Electrical Workers Local 134, which was looking to move out of its West Side union hall.
The IBEW local brought in Wight & Company, which performed a feasibility study using cloud point laser scanning, structural testing, and geotechnical testing to verify that the school could be transformed into the proposed new use.
The 70,000-sf project involved 48,000 sf of renovation and 22,000 sf of new construction. The structure was heavily reconstructed to accommodate business offices, lounges, conference rooms, a museum, and a rooftop patio. Memorial Hall, the 22,000-sf addition, can seat 1,000 and can be easily reconfigured for events ranging from banquets to training. The addition also houses a gymnasium that is open to local residents.
Sustainability features include architectural overhangs to control solar heat gain, as well as permeable pavers and rain gardens for stormwater detention. And, of course, LED fixtures that connect back to a central lighting system.
Naturally, light plays a key role in the new building. Not only does it represent the union’s trade, it also creates an ambient backdrop at the entry plaza and into the mass of the union hall.
IBEW logos measuring 25 feet in height were printed on the exterior glass and backlit by LED lights. This creates a “firefly” effect to attract community members to the building, now known affectionately as “the Beacon of Bronzeville.”
Silver Award Winner
BUILDING TEAM Wight & Company (submitting firm, architect, SE, MEP, CM) International Brotherhood of Electrical Workers Local 134 (owner) DETAILS 70,000 sf Total cost $25 million Construction time October 2016 to March 2018 Delivery method Design-build
Related Stories
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.