flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

IBEW Local 134 Union Hall: Union lights a 'beacon'

Reconstruction Awards

IBEW Local 134 Union Hall: Union lights a 'beacon'

Electrical workers’ local converts an abandoned Chicago school into a brightly lit union hall.


By David Malone, Associate Editor | November 28, 2018
IBEW Local 134

The LED illumination acts as a welcome sign to the community, while calling attention to the IBEW’s professional trade. Paul Schlismann Photography.

Drake elementary school was one of 47 elementary schools decommissioned by Chicago Public Schools in 2014, due to declining student enrollment. The building, constructed in the 1960s in the Bronzeville neighborhood, south of the Loop, attracted the interest of International Brotherhood of Electrical Workers Local 134, which was looking to move out of its West Side union hall.

The IBEW local brought in Wight & Company, which performed a feasibility study using cloud point laser scanning, structural testing, and geotechnical testing to verify that the school could be transformed into the proposed new use.

The 70,000-sf project involved 48,000 sf of renovation and 22,000 sf of new construction. The structure was heavily reconstructed to accommodate business offices, lounges, conference rooms, a museum, and a rooftop patio. Memorial Hall, the 22,000-sf addition, can seat 1,000 and can be easily reconfigured for events ranging from banquets to training. The addition also houses a gymnasium that is open to local residents.

Sustainability features include architectural overhangs to control solar heat gain, as well as permeable pavers and rain gardens for stormwater detention. And, of course, LED fixtures that connect back to a central lighting system.

Naturally, light plays a key role in the new building. Not only does it represent the union’s trade, it also creates an ambient backdrop at the entry plaza and into the mass of the union hall.

IBEW logos measuring 25 feet in height were printed on the exterior glass and backlit by LED lights. This creates a “firefly” effect to attract community members to the building, now known affectionately as “the Beacon of Bronzeville.”

 

Silver Award Winner

BUILDING TEAM Wight & Company (submitting firm, architect, SE, MEP, CM) International Brotherhood of Electrical Workers Local 134 (owner) DETAILS 70,000 sf Total cost $25 million Construction time October 2016 to March 2018 Delivery method Design-build

Related Stories

Reconstruction Awards | Dec 1, 2017

Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub

In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.

Reconstruction Awards | Dec 1, 2017

Gothic revival: The nation’s first residential college is meticulously restored

This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.

Reconstruction Awards | Dec 1, 2017

Rockefeller remake: Iconic New York tower is modernized for its next life

To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.

Reconstruction Awards | Nov 30, 2017

BD+C's 2017 Reconstruction Award Winners

Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.

Reconstruction Awards | Nov 29, 2017

College credit: Historic rehab saves 50% on energy costs

The project team conducted surveys of students, faculty, and staff to get their input.

Reconstruction Awards | Nov 29, 2017

Amazing grace: Renovation turns a church into elegant condos

The windows became The Sanctuary’s chief sales edge.

Reconstruction Awards | Nov 28, 2017

Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan

The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.

Reconstruction Awards | Nov 27, 2017

Higher education: The rebirth of a Washington, D.C., high school

The project team, led by architect Perkins Eastman, restored the original cupola.

Reconstruction Awards | Nov 27, 2017

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

The project team had to fix poor renovations made in the ’50s.

Reconstruction Awards | Nov 27, 2017

Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds

Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021