Through a unique partnership between a public media organization and a performing arts/education entity, a historic building in the heart of downtown Cleveland has been renovated as a model of sustainability and architectural innovation.
![]() |
PHOTO: KEVIN REEVES PHOTOGRAPHY |
Playhouse Square, which had been working for more than 30 years to revitalize the city's arts district, teamed up with ideastream, a newly formed media group that combined public TV station WVIZ/PBS and FM radio station WCPN, to create a novel, inventive space for the performing arts, education programs, and radio broadcasting, as well as leased office space.
Local A/E firm Westlake Reed Leskosky (WRL) and the Cleveland office of URS Corp. got to work integrating a trendy, open design—and one that would save energy—into the existing structure.
The facility's main architectural feature is its transparency and openness, which exposes the center's cultural and educational activities to downtown Cleveland traffic. Restoring the storefront created “a simple, clean opening” to the activity within the center for passersby, notes Christopher Diehl, AIA, URS's VP and director of design.
Starting with the building's entry, an inverted canopy was designed to welcome visitors into a glass-enclosed vestibule where dance and broadcast/recording studios are easily visible. Colored cables, electronics, motors, and sound and light systems are exposed to add to the excitement of a backstage studio environment. The entry vestibule guides visitors to the historic lobby, with its ornamental staircase leading to a mezzanine, with its restored balustrade and new glass floor.
![]() |
Floor-to-ceiling glass walls put the facility’s dance and broadcast/recording studios on display, adding to the vibrancy of the interior space. PHOTO: KEVIN REEVES PHOTOGRAPHY |
“The existing mezzanine landing was a dark and oppressive form overhead as one entered the lobby,” says Diehl. “We felt it was critical to the entry and journey experience to remove the brooding heaviness overhead, and open up the landing on both sides. The result is a space that feels much lighter and one that allows the activity to be viewed on all sides.”
Further inside, activities on multiple floors are connected, physically and visually, through deep wells and stairways cut into the building. Large windows, designed according to the size, proportion, and geometry of the original windows, take advantage of federal Historic Rehabilitation Tax Credits.
Robert L. Selby, FAIA, associate professor, School of Architecture, University of Illinois at Urbana-Champaign, commends the project for its sense of openness. “I like the way it gives high visibility to the arts,” he says.
Adding to the culturally vibrancy of the building is a state-of-the-art, 300-seat production theater, a new construction suspended over an existing loading dock and service alley. Featuring a collapsible, portable seating system, as well as customized floor construction and dual lighting to support both television and theatrical productions, the black-box space posed unique structural challenges.
Westlake Reed Leskosky, serving also as structural engineer, took the approach of maintaining the load path from the existing floor plate and columns to the foundations of the existing concrete structure. This eliminated the need to remove the first- and second-floor interior columns and floor slabs, or to redirect load transfer to the foundations; it also made it possible to suspend the new theater from the existing structure, with minimal new columns underneath, in order to maintain vehicle circulation underneath the studio.
Beyond the technical details, the real brilliance of the new theater is the efficiencies captured by space sharing.
“Playhouse Square needed a theater, ideastream needed a media studio, and both organizations have an educational mission,” notes Kathryn P. Jensen, ideastream's COO. “By integrating the two purposes, we saved what would have separately cost us $7 million.”
Having multiple high-tech tenants in a building will often create waste, because each wants to maintain separate systems for power distribution, heating and cooling, and other basic components, notes WRL associate and mechanical engineer Matthew Murphy, PE. With its central plant and shared systems and infrastructure, Idea Center creates architectural and engineering synergies that lead to lower operating costs and higher efficiency. The project earned a Silver rating under the U.S. Green Building Council's LEED-CI (commercial interiors) program.
To support the radio stations and high-tech tenants, the facility houses a robust and redundant power distribution, UPS backup, and ground and standby generator systems. EMI shielding protects the sensitive high-frequency communication cables from magnetic fields emitted by the distribution systems.
To meet high acoustical requirements (NC-15, as opposed to NC 40-45 for typical offices), motorized equipment and transformers are isolated, cooling equipment is sited in a remote location, distribution ductwork is lined with acoustical material, and ductwork distribution pathways are designed in large sections with circuitous routes to allow for noise dissipation and lower velocity airflow.
The true success of the Idea Center, however, is the vibrancy it is contributing to the Playhouse Square district. As lead designer Paul E. Westlake, Jr., FAIA, put it, “The fabric woven here is the cloth of community culture.”
Related Stories
Sponsored | Performing Arts Centers | Jan 17, 2024
Performance-based facilities for performing arts boost the bottom line
A look at design trends for “budget-wise” performing arts facilities reveals ways in which well-planned and well-built facilities help performers and audiences get the most out of the arts. This continuing education course is worth 1.0 AIA learning unit.
Cultural Facilities | Nov 21, 2023
Arizona’s Water Education Center will teach visitors about water conservation and reuse strategies
Phoenix-based architecture firm Jones Studio will design the Water Education Center for Central Arizona Project (CAP)—a 336-mile aqueduct system that delivers Colorado River water to almost 6 million people, more than 80% of the state’s population. The Center will allow the public to explore CAP’s history, operations, and impact on Arizona.
Giants 400 | Nov 6, 2023
Top 65 Cultural Facility Construction Firms for 2023
Turner Construction, Clark Group, Whiting-Turner, Gilbane, and Holder Construction top BD+C's ranking of the nation's largest cultural facilities sector general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all cultural building sectors, including concert venues, art galleries, museums, performing arts centers, and public libraries.
Giants 400 | Nov 6, 2023
Top 60 Cultural Facility Engineering Firms for 2023
KPFF, Arup, Thornton Tomasetti, Tetra Tech, and WSP head BD+C's ranking of the nation's largest cultural facilities sector engineering and engineering architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all cultural building sectors, including concert venues, art galleries, museums, performing arts centers, and public libraries.
Giants 400 | Nov 6, 2023
Top 110 Cultural Facility Architecture Firms for 2023
Populous, Gensler, HGA, DLR Group, and Quinn Evans top BD+C's ranking of the nation's largest cultural facilities sector architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all cultural building sectors, including concert venues, art galleries, museums, performing arts centers, and public libraries.
Cultural Facilities | Sep 24, 2023
Boston’s Prudential Center showcases a new three-floor observatory
A reconfiguration of mechanical and cooling systems made way for “View Boston,” designed by Perkins & Will.
Mass Timber | Sep 1, 2023
Community-driven library project brings CLT to La Conner, Wash.
The project, designed by Seattle-based architecture firm BuildingWork, was conceived with the history and culture of the local Swinomish Indian Tribal Community in mind.
Laboratories | Aug 24, 2023
Net-zero carbon science center breaks ground in Canada
Designed by Diamond Schmitt, the new Atlantic Science Enterprise Centre (ASEC) will provide federal scientists and partners with state-of-the-art space and equipment to collaborate on research opportunities.
Giants 400 | Aug 22, 2023
Top 115 Architecture Engineering Firms for 2023
Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.
Giants 400 | Aug 22, 2023
2023 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms
A record 552 AEC firms submitted data for BD+C's 2023 Giants 400 Report. The final report includes 137 rankings across 25 building sectors and specialty categories.