flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Illinois law sets maximum retainage on private projects

Codes and Standards

Illinois law sets maximum retainage on private projects

The change is expected to give contractors bigger checks earlier in project timeline.


By Peter Fabris, Contributing Editor | September 12, 2019
Illinois law sets maximum retainage on private projects

Photo: Pixabay

   

A new Illinois law sets the maximum retainage clients can withhold from contractor payments on private projects.

The change went into effect on August 20, and is expected to help many general contractors and subcontractors receive bigger checks earlier in the project timeline.

The new rule forbids customers from withholding more than 10% retainage from contractor payments, and orders retainage to be reduced to 5% after a contractor has completed half of the work.

The new law applies to all construction contracts. Twenty states have enacted legislation that caps private contract retainage at 10% or less. One state, New Mexico, prohibits any retainage from being withheld from a construction contract.

The legislation can be considered a codification of what already is standard industry practice. But, it should provide some relief because general contractors and subcontractors will be able to pay bills sooner with the additional 5%.

Related Stories

Codes and Standards | Sep 3, 2020

Turner Construction takes strong stand against racism

Shuts down work sites for anti-bias training.

Codes and Standards | Sep 2, 2020

California releases guide for state water policy

Water Resilience Portfolio is roadmap for meeting water needs as climate changes.

Codes and Standards | Aug 25, 2020

Platform will allow researchers to test energy system integration at scale

The U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) recently launched the Advanced Research on Integrated Energy Systems (ARIES) platform.

Codes and Standards | Aug 20, 2020

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.

Codes and Standards | Aug 18, 2020

Florida becomes the third state to adopt concrete repair code

Sets minimum requirements for design, construction, repair of concrete structural elements in buildings.

Codes and Standards | Aug 17, 2020

ASCE seeks comments on seismic standard

Pertains to design criteria for nuclear facilities.

Codes and Standards | Aug 13, 2020

COVID-19 reboot guide offers strategies for reopening K-12 schools

Looks at space considerations for reopening at different scales.

Codes and Standards | Aug 12, 2020

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021