flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An industrial ‘eyesore’ is getting new life as an apartment complex

Multifamily Housing

An industrial ‘eyesore’ is getting new life as an apartment complex

The project, in Metuchen, N.J., includes significant improvements to a nearby wildlife preserve.


By John Caulfield, Senior Editor | May 12, 2023
Rendering of Class A apartment building in Metuchen, N.J, that replaces a factory-warehouse.
A Class-A apartment building will replace a factory-warehouse that's been closed for decades in Metuchen, N.J. The developer is paying for this redevelopment through an incentive program that will provide the municipality with investment capital for infrastructure improvements. Image credit: Klein Enterprises

Last month, the demolition of a dilapidated warehouse/factory in Metuchen, N.J., commenced to make way for an apartment complex with 272 Class A studio, one-, two-, and three-bedroom units.

The multifamily community redevelopment is being spearheaded by Klein Enterprises, a 75-year-old firm with nearly 60 assets in its portfolio. Last year, Klein acquired the Gulton factory as part of the development parcel that is adjacent to a 30-acre wildlife preserve. It made that acquisition under the PILOT incentive program, which allows the developer to make payments to the borough in lieu of taxes based on the project’s revenue. Over the 30-year agreement, it is estimated that Klein Enterprises will pay $20 million. The borough would receive 95 percent of the PILOT revenue.

This project will provide Metuchen—a bedroom community that’s a 45-minute train ride from New York City—with millions of dollars to invest in infrastructure. Prior to the start of the factory demolition, the property had already undergone a $10 million environmental remediation that included the planting of 3,000 trees. (The land is bounded on the west by a borough-owned woodland within the wildlife preserve, which will receive $1 million of Klein’s PILOT payments earmarked for improvements that include a network of trails and paths, more open space, and access and parking for a new nature preserve.)

A solution after years of discussion

The apartment complex is expected to take 24 months to complete by the fall of 2025. Fifteen percent of the units will meet New Jersey’s affordable housing requirements. Six of the apartments, all on the ground floor, will be one-bedroom live-work homes.

The community’s interior design will honor artists, literary figures, and intellectuals who brought culture and the arts to Metuchen in the 1800s. The project is also pursuing green initiatives that include a partial green roof, large solar array, electric car charging stations, LED lighting, and a pollinator garden. Other amenities will include a dog park, pool, and community garden.

The site of the apartment complex is located at 212 Durham Avenue. Metuchen Realty Advisors, which acquired the land in 1986 and did the environmental cleanup, sold a piece of the land to Middlesex County, and will transfer the remaining open space after the community is completed. This land is adjacent to the planned expansion of the popular Middlesex County Greenway linear park.

Metuchen Mayor Jonathan M. Busch was quoted as stating that discussions about how to redevelop this industrial site had been ongoing for decades. (The Borough designated the Gulton property as an area in need of development in 2015.) The redevelopment, he stated, “enable[s] us to open the largest recreational space in Metuchen, fund a variety of important infrastructure projects, and help protect our environment, all while providing our community with new housing options.”

The apartment complex is located near Metuchen’s train station, and will be within walking distance to the borough’s downtown.

Related Stories

Resiliency | Sep 3, 2024

Phius introduces retrofit standard for more resilient buildings

Phius recently released, REVIVE 2024, a retrofit standard for more resilient buildings. The standard focuses on resilience against grid outages by ensuring structures remain habitable for at least a week during extreme weather events.

Products and Materials | Aug 31, 2024

Top building products for August 2024

BD+C Editors break down August's top 15 building products, from waterproof wall panel systems to portable indoor pickleball surface solutions.

Adaptive Reuse | Aug 29, 2024

More than 1.2 billion sf of office space have strong potential for residential conversion

More than 1.2 billion sf of U.S. office space—14.8% of the nation’s total—have strong potential for conversion to residential use, according to real estate software and services firm Yardi. Yardi’s new Conversion Feasibility Index scores office buildings on their suitability for multifamily conversion.

Adaptive Reuse | Aug 28, 2024

Cities in Washington State will offer tax breaks for office-to-residential conversions

A law passed earlier this year by the Washington State Legislature allows developers to defer sales and use taxes if they convert existing structures, including office buildings, into affordable housing.

Affordable Housing | Aug 27, 2024

Not gaining community support is key barrier to more affordable housing projects

In a recent survey, builders and planners cited difficulty in generating community support as a key challenge to getting more affordable housing projects built. The survey by coUrbanize found that 94% of respondents tried to gain community input and support through public meetings, but many were frustrated by low attendance. Few respondents thought the process was productive.

Adaptive Reuse | Aug 22, 2024

6 key fire and life safety considerations for office-to-residential conversions

Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.

Multifamily Housing | Aug 21, 2024

Nation's leading multifamily developer expands into infrastructure

Greystar's strategy for infrastructure is driven by the shifting landscape of today's cities—primarily in the increased digitization, urbanization, and transitions to clean energy.

MFPRO+ New Projects | Aug 20, 2024

Seattle workforce housing project inspired by geology of eastern Washington

J.G. Whittier Apartments, a workforce housing project in Seattle uses the geology of eastern Washington as inspiration for the design. The architecture and interior design celebrate geometric anomalies found in nature. At the corners of the building, blackened wood siding “erodes” to expose vibrant murals underneath.

MFPRO+ New Projects | Aug 16, 2024

At 60 stories, the Paramount multifamily development will stand as Nashville’s tallest high rise

When complete, the 60-story Paramount building, at 750 feet high, will be the tallest high rise tower in Nashville, Tenn., surpassing the city’s current record holder, the 617-foot AT&T Building. The $390 million Paramount project recently launched condo sales after securing more than $230 million in construction financing.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021