The Butler Square building was once a 1,800-seat athletic venue for the Minneapolis Millers and the St. Paul Saints. A century later, this nine-story historic landmark in Downtown Minneapolis is better known as the home to corporate offices for companies like AIMIA. After an extensive renovation, INSTALL Warranty contractor Sonus Interiors was thorough with the new flooring installation, creating zoned workspaces that are welcoming to both clients and employees.
Project: AIMIA Corporate Office
Location: Minneapolis, MN
Contractor: Sonus Interiors
Design Overview
Relocating AIMIA’s U.S. corporate headquarters to the historic Butler Square building in downtown Minneapolis was an opportunity for architect MSR Design to help the company redefine its workplace culture. Gone were traditional cubicles, and in entered expansive collaborative workspaces, meeting tables and lounge-type furniture that provide choice and flexibility for employees. Three different color-coded neighborhoods provide differentiation and facilitate wayfinding throughout the office.
Installation Challenges
Faced with a limited budget, MSR selected cost-effective finishes and furniture to be used in innovative ways. While these decisions ultimately saved money, the flooring installation process was complex and time constraints meant that there was zero room for error.
INSTALL Warranty Contractor Sonus Interiors was selected to head up the flooring installation based on a preexisting relationship with the property management team. They were entrusted with the renovation, and immediately got to work with the architect to plan and install the intricate zoned design.
Incorporating twenty four different types of carpet, this project was no ordinary retrofit. In fact, the interior architect’s design was so complex that one journeyman was devoted to navigating the pattern, while the other journeyman completed the installation.
The pattern wasn’t the only challenge. During the initial tear-out of the existing office space, the floors were so sticky from previous glue that you could literally get stuck in it. Having construction debris ground into the glue would have been a nightmare, so Sonus Interiors used a primer to seal the existing floors. If they had not done this, the time spent to scrape the floors of construction debris would have been exhausting, and it would have been a hazard to the other trades working in the space.
Results
While the project proved complicated, with unexpected finds and a tight timeline, there was no delay when it came to the flooring installation. Thanks to Sonus Interiors’ INSTALL training and certification, the team was able to ensure the integrity of the intricate design and provide a vibrant and contemporary new home for AIMIA. The resulting installation offers a seamless, bright and playful space that employees will enjoy for many years to come.
INSTALL understands the importance of quality installation. You can renovate with confidence and exceed expectations with INSTALL as your flooring insurance. We provide our certified flooring installers with the training and expertise to deliver the floor as you designed it.
Contact: John McGrath
Phone: 215-582-4108
Email: install@carpenters.org
Website: INSTALLfloors.org
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Feb 16, 2012
Summit Design + Build begins build-out for Emmi Solutions in Chicago
The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Oct 18, 2011
Dow Building Solutions invests in two research facilities to deliver data to building and construction industry
State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Oct 4, 2011
GREENBUILD 2011: Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones.
| Oct 4, 2011
GREENBUILD 2011: Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available.