flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Insulated wall system cuts down installation time

Products and Materials

Insulated wall system cuts down installation time

ProGUARD DP is a combined system cuts installation time down to one-third that of traditional wall systems.


By David Malone, Associate Editor | August 30, 2017
The ProGuard concrete Board system being used
The ProGuard concrete Board system being used

The ProGUARD DP Insulated Concrete Board system uses fully engineered panels that offer thermal protection with ship-lapped edges to eliminate thermal breaks and meet continuous insulation requirements.

ProGUARD DP is a combined system that eliminates the separate steps of the drainage plane, insulation, wire lathe, and mortar bed to cut installation time down to one-third that of traditional wall systems. The concrete board and insulation board are laminated together, which results in the use of a quarter-inch concrete board (as opposed to a half-inch) for a more lightweight assembly than in traditional systems.

 

ProGuard used on a building

 

ProGUARD DP can be used with thin brick, thin natural stone, thin porcelain tile, thin manufactured stone, stucco, and synthetic stucco.

Related Stories

| Aug 11, 2010

Walmart establishes sustainable product index to evaluate 'greeness' of products

Walmart today announced plans to develop a worldwide sustainable product index during a meeting with 1,500 of its suppliers, associates and sustainability leaders at its home office. The index will establish a single source of data for evaluating the sustainability of products.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Manitoba Hydro Place, Tornado Tower among world's 'best tall buildings,' according to the Council on Tall Buildings and Urban Habitat

The Council on Tall Buildings and Urban Habitat last week announced the winners of its annual “Best Tall Building” awards for 2009, recognizing one outstanding tall building from each of four geographical regions: Americas, Asia & Australia, Europe, and Middle East & Africa. This year’s winners are: Manitoba Hydro Place, Winnipeg, Canada; Linked Hybrid, Beijing, China; The Broadgate Tower, London, UK; Tornado Tower, Doha, Qatar.

| Aug 11, 2010

Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

| Aug 11, 2010

Marks 175 Bio biometric fingerprint reader with leverset

The New 175 BIO is a Hi-Tech fingerprint recognition system that eliminates the risk of replication or unauthorized use.

| Aug 11, 2010

Vytec Yukon Board premium insulated siding offers new design, accessories

Yukon Board Premium Insulated Siding from CertainTeed Corporation’s Vytec brand of vinyl siding products, welcomes a new updated design.

| Aug 11, 2010

Metl-span panels add strength to fitness center

The new Centegra Health Bridge Fitness Center is located on the 40-acre Centegra Health Campus in Huntley, IL. The 120,000 sq. ft. facility presents a high-tech exterior look that features a “running bond” panel pattern plus random placement of two different silver colors of Metl-Span panels. The running bond pattern creates a distinctive appearance by staggering the vertical joints between panels.

| Aug 11, 2010

AAMA leads development of BIM standard for fenestration products

The American Architectural Manufacturers Association’s newly formed BIM Task Group met during the AAMA National Fall Conference to discuss the need for an BIM standard for nonresidential fenestration products.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021