flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

International Green Construction Code will include option for outcome-based approach

International Green Construction Code will include option for outcome-based approach

The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. 


By Peter Fabris, Contributing Editor | November 26, 2014
Photo: krishnan via FreeDigitalPhotos.net
Photo: krishnan via FreeDigitalPhotos.net

The 2015 International Green Construction Code (IgCC) will include the option to use an outcome-based approach when complying with local building energy codes, the first time the IgCC has allowed this method.

Previously, building energy codes relied on two main pathways to demonstrate compliance: performance (modeling energy consumption), and prescriptive measures (following code-defined values for individual building components). Both approaches fail to fully account for how buildings use power once they are completed, occupied, and maintained, according to the Institute for Market Transformation (IMT).

The new provision will help communities to ensure energy-efficient buildings are meeting performance expectations. The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. This will ease pressure on code departments and align with the growing number of energy benchmarking regulations across the country, IMT says.

The decision to include an outcome-based pathway in the 2015 IgCC will directly influence future editions of the IgCC and other codes such as the Energy Conservation Code. This should smooth the process of including ASHRAE Standard 189.1 and the LEED green building program into the development of the IgCC, IMT says.

(http://www.imt.org/news/the-current/outcome-based-pathway-is-voted-into-the-2015-igcc)

Related Stories

Codes and Standards | Nov 2, 2020

Wildfires can make drinking water toxic

Updated building codes could mitigate the danger.

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Codes and Standards | Oct 26, 2020

New seismic provisions for the National Earthquake Hazards Reduction Program released

The provisions present a set of recommended improvements to the ASCE/SEI 7-16 Standard.

Codes and Standards | Oct 22, 2020

More than 130 building projects have engaged LEED’s Safety First Credits in response to COVID-19

Best practices helping companies develop and measure healthy, sustainable, and resilient reopening efforts.

Codes and Standards | Oct 21, 2020

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.

Codes and Standards | Oct 20, 2020

Updated AIA Contractor’s Qualification Statement and Warranty Bond documents available

Statement now includes safety protocols and plans, sustainability, and BIM experience.

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021