A decade ago, Go the Distance Baseball formed to preserve the Iowa farm site where the 1989 movie Field of Dreams was filmed. The farmhouse can be rented or toured, and the venue includes a souvenir shop, ballpark concessions, and a field where visitors can have a catch. It’s expected to attract about 300,000 visitors this year.
Recently, the venue’s new owners unveiled a plan to build a youth baseball and softball destination for players, fans, and tourists, while preserving the cornfield setting and working farm. With $80 million in private investment, the master plan will almost double the site’s size—adding almost 100 acres to the original 190-acre footprint of the former Lansing family farm and movie site. The project will include nine new ballfields, dormitories for teams, and a boutique hotel, all slated to be completed in phases by the end of 2023.
“While the substantial private investment will expand and enhance our facilities, we are deeply committed to preserving the romantic experience of the Field of Dreams, including the views, the baseball diamond, the farmhouse, and the cornfields. Those images will never change,” COO Dan Evans, a longtime executive for five MLB franchises, said in a statement.
Additional phases through 2025 will include a 100,000-square-foot fieldhouse, an outdoor concert amphitheater, an RV park, a large park inclusive for children and adults with disabilities, and jogging trails through the cornfields. When fully completed, the development will create about 170 new full-time-equivalent jobs. Area residents can have member access to the indoor fieldhouse and a training facility for year-round recreation.
“Preserving and enhancing one of Iowa’s top tourism destinations makes this project a win-win for the local and state economies,” Keith Rahe, president and CEO of Travel Dubuque, said in a statement.
Owner: Go the Distance Baseball, LLC
Owner’s representative: Leopardo Companies
Design architect and architect of record: RDG Planning & Design
MEP engineer: KCL Engineers
Structural engineer: Origin Design
Related Stories
Sports and Recreational Facilities | Apr 27, 2020
Erudite eSports: Colleges build their very own eSports arenas
Universities are building dedicated spaces for eSport athletes to pick up the sticks.
Sports and Recreational Facilities | Feb 27, 2020
Disney to develop private island destination in The Bahamas
This will be Disney’s second private island retreat.
Sports and Recreational Facilities | Feb 25, 2020
The world’s largest cricket stadium opens
Populous designed the project.
Sports and Recreational Facilities | Feb 6, 2020
Europe’s first LEGOLAND Water Park is set to open
The water park will be part of Italy’s Gardaland Theme Park in Gardaland, Italy.
Sports and Recreational Facilities | Jan 20, 2020
Construction begins on $1.8 billion addition to the Washington State Convention Center
LMN Architects designed the project.
GIANTS 19 PREMIUM | Dec 23, 2019
Top 65 Sports Facilities Engineering Firms for 2019
Walter P Moore, Kimley-Horn, ME Engineers, Thornton Tomasetti, and EXP head the rankings of the nation's largest sports facilities sector engineering and engineering/architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.
GIANTS 19 PREMIUM | Dec 23, 2019
Top 90 Sports Facilities Architecture Firms for 2019
Populous, HKS, HOK, Gensler, and HNTB top the rankings of the nation's largest sports facilities sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.
Sports and Recreational Facilities | Dec 6, 2019
An architect in Florence proposes a new soccer stadium as part of a larger urban redevelopment
The owner of Fiorentina, the soccer team, wants to move into a new facility by 2023.
Sports and Recreational Facilities | Nov 22, 2019
HKS designs Team Vitality’s new Paris HQ
The facility is meant to draw in more than just eSports fans.
Reconstruction Awards | Nov 8, 2019
2019 Reconstruction Awards: The 1060 Project at Wrigley Field
Venerable Wrigley Field is raised up in a top-to-bottom restoration that took five years to complete.