flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

iProspect selects VLK Architects for new office design

iProspect selects VLK Architects for new office design


By By BD+C Staff | October 27, 2011
iProspects new office, estimated around 25,000 sf, will focus on modernization and giving their employees a good living space.

 

Global digital marketing agency iProspect has selected VLKArchitects, Inc. for design services on its new Fort Worth office.

“iProspect is a very progressive online marketing agency,” states VLK Senior Associate Sloan Harris. “VLK was selected for its creative design expertise and we are excited to work with such a unique company on this project.”

Company growth prompted iProspect to make the decision to move to a new space. The company will be moving from its original location around the Stockyards in Fort Worth to the revitalized Cultural District area, off West 7th Street. “We’ve been in the Stockyards for 10 years and have loved that space,” says iProspect Managing Director Price Glomski. “We want to keep the ambiance from our Stockyards’ office location and we know VLK will be able to carry that design to our new office.”

iProspect’s new office, estimated around 25,000 sf, will focus on modernization and giving their employees a good living space. The open layout will allow employees to focus on group orientation and team building. A giant kitchen will be created to serve as the centerpiece of the office. In addition, the company wants to incorporate sustainable elements into the design. “We admire what VLK has done so far with green design and we want to embrace that in our new office,” states Glomski. BD+C

Related Stories

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021