flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In it for the long run – Why comprehensive O&M services are a must

Sponsored Content M/E/P Systems

In it for the long run – Why comprehensive O&M services are a must

In order to safely and effectively maximize return on investment, minimizing operating costs and optimizing asset performance is essential


By Panasonic | October 30, 2015
In it for the long run – Why comprehensive O&M services are a must

Macerich – Twenty Ninth Street Mall – Boulder, CO

Today, clean energy is becoming a requirement, not just a suggestion, as more states implement energy efficiency resource standards and goals. To help fulfill these mandates, many building professionals are turning to solar. In fact, according to SEIA, in Q1 2015 more than 51 percent of all new electric generating capacity in the U.S. came from solar, adding to the 22.7 GW of solar already installed in the country.

But while American businesses are going solar to meet rising expectations, they’re also doing it because they know it’s good for their bottom line. Electricity prices are increasing across the country and solar helps minimize these costs and stabilize energy budgets.

The road ahead

With financing and a solid implementation plan in place, organizations can begin building the system that will power their facility. Putting all of the pieces together and seeing the final installation come to life is an exciting time, allowing companies to join the growing number of businesses going solar and reap energy savings.

But unfortunately, more often than not, strong project support at the start diminishes down the line once a project is completed, where it can often be most crucial. It’s important to have a partner who can provide comprehensive, long-term O&M services that ensure projects remain up and running at maximum efficiency without a hitch for years to come.

What’s the value of long-term O&M?

With the sun shining and solar providing clean, cost-efficient energy, what’s the worry?

In order to safely and effectively maximize return on investment, minimizing operating costs and optimizing asset performance is essential. This requires a partner who can provide the full O&M package: NOC and maintenance services, operations and asset management, total system protection, and guarantees.

Together, these services ensure real-time monitoring, performance reporting, high safety standards, system cleaning and annual maintenance plans that protect long-term reliability and control long-term costs. Developing long-term O&M warranties and performance guarantees with a financially sound partner adds a level of peace of mind that’s often missing.

O&M at play

Consisting of more than 85 properties across 19 states, Macerich is a fully integrated, self-managed and self-administered real estate investment trust which focuses on the acquisition, leasing, management, development and redevelopment of regional malls throughout the United States. 

When the Macerich portfolio of properties decided to implement solar, O&M of each unique system posed its own distinctive set of challenges. Macerich needed a partner it could trust to be a dependable, consistent provider of those services for more than two decades at a wide variety of sites.

With their extensive global network, Panasonic ensured quality implementation for every aspect of each individual project, regardless of location. And, as a nearly 100 year-old, $64 billion company, Panasonic guaranteed its ability to fulfill the 20 year commitment to sustaining expert operations and maintenance of Macerich’s solar systems.

To keep each installation thriving, Panasonic works with its teams across the country to perform annual maintenance. When an issue does arise, the Panasonic O&M planning and scheduling team dispatches a technician, optimizing their time onsite to ensure a fast, reliable and cost-effective solution is put into place.

Through long-term O&M guarantees, organizations like Macerich reduce stress and eliminate worry about brand management and reputation.

To learn more about Panasonic O&M services, please visit www.panasonic.com/contactus.

Related Stories

| Mar 17, 2011

Hospitality industry turns to HTS Texas for ‘do not disturb’ air conditioned comfort

Large resort hotels and hospitality properties throughout the Southwest have been working with local contractors, engineers and HTS Texas for the latest innovations in quiet heating, ventilating and air conditioning (HVAC) equipment. The company has completed 12+ projects throughout Texas and the Southwestern U.S. over the past 18 to 24 months, and is currently working on six more hotel projects throughout the region.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Nov 9, 2010

U.S. Army steps up requirements for greening building

Cool roofs, solar water heating, and advanced metering are among energy-efficiency elements that will have to be used in new permanent Army buildings in the U.S. and abroad starting in FY 2013. Designs for new construction and major renovations will incorporate sustainable design and development principles contained in ASHRAE 189.1.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Oct 12, 2010

Cell and Genome Sciences Building, Farmington, Conn.

27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.

| Oct 12, 2010

Full Steam Ahead for Sustainable Power Plant

An innovative restoration turns a historic but inoperable coal-burning steam plant into a modern, energy-efficient marvel at Duke University.

| Sep 30, 2010

Luxury hotels lead industry in green accommodations

Results from the American Hotel & Lodging Association’s 2010 Lodging Survey showed that luxury and upper-upscale hotels are most likely to feature green amenities and earn green certifications. Results were tallied from 8,800 respondents, for a very respectable 18% response rate. Questions focused on 14 green-related categories, including allergy-free rooms, water-saving programs, energy management systems, recycling programs, green certification, and green renovation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021