The Singapore Changi Airport is, according to the most recent numbers from the Airports Council International, the 17th busiest airport in the world by passenger traffic. With so many people passing through on a daily basis, it was important for the new addition to the Crowne Plaza Changi Airport hotel to be built in as little time as possible.
The new building was Singapore’s first private sector commercial project to use pre-fabricated, pre-finished volumetric construction (PPVC), which led to the addition being built in just 26 days. WOHA designed the original 320-room hotel as well as the 243-room, 103,495-sf addition.
Photo: Patrick Bingham-Hall.
The use of the PPVC method slashed manpower requirements on site by as much as 45%, reduced overall construction time by 17%, and accomplished both of these with about 40% in manpower savings.
Photo: Patrick Bingham-Hall.
“The Crowne Plaza Changi Airport hotel extension (CPEX) demonstrates that it is possible to significantly reduce the number of workers required, shorten construction time, improve building quality and even overcome site constraints by changing the way we build,” says Singapore’s Building and Construction Authority CEO John Keung in a release.
Photo: Patrick Bingham-Hall.
Related Stories
| May 30, 2018
Accelerate Live! talk: An AEC giant’s roadmap for integrating design, manufacturing, and construction
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Skender CEO Mark Skender and Chief Design Officer Tim Swanson present the construction giant’s vision for creating a manufacturing-minded, vertically-integrated design-manufacturing-build business model.
| May 30, 2018
Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.
| May 24, 2018
Accelerate Live! talk: Security and the built environment: Insights from an embassy designer
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.
Hotel Facilities | May 4, 2018
Retro hotel is inspired by Spaghetti Westerns
There’s two types of people in this world: those who like The Good, The Bad, and The Ugly, and those who are wrong.
Hotel Facilities | Apr 27, 2018
Hotel Zachary opens next to Chicago’s Wrigley Field
Stantec Architecture and Studio K Creative designed the project.
Hotel Facilities | Apr 25, 2018
15-story Cambria Hotel opens in Philadelphia
DAS Architects designed the project.
Hotel Facilities | Apr 13, 2018
BIG’s Audemars Piguet hotel des Horlogers allows guests to ski down the roof
The 75,000-sf hotel is currently under construction.
Hotel Facilities | Apr 3, 2018
Downtown Seattle receives new flagship Embassy Suites in Pioneer Square
The hotel brings 282 suites to Seattle’s oldest neighborhood.
Hotel Facilities | Mar 6, 2018
A New Hampshire college offers student housing as hotel rooms during the summer
The opening of a new residence hall could help with Plymouth State University’s hospitality marketing.
Hotel Facilities | Feb 28, 2018
Sheldon Chalet is Denali National Park’s first and only luxury hotel
Decades in the making, the chalet is located within 10 miles of Denali’s summit.