Caldera House, Jackson Hole’s newest hotel located in the heart of Teton Village, is a 70,000-sf five-star ski club that includes eight luxury condominiums. The hotel combines contemporary style with subtle details from the American West.
The six-floor building features an exterior of glass, wood-paneling, regionally-sourced stone, copper panels, and black steel accents. Amenity spaces include an in-house gear shop, gym, spa, private lounge and bar, the Old Yellowstone Garage restaurant, and a casual grab-and-go restaurant.
Carney Logan Burke Architects (CLB) designed the hotel and worked with Commune Design on the public amenity spaces to integrate them into the overall design scheme. The hotel also includes eight luxury condominium units, two of which CLB did the interior design for. One of the 5,000-sf units is styled with a modern cabin feel while the other has a more contemporary aesthetic. The remaining four condo units include white oak paneling and floors, open-plan kitchens, and bedrooms with built-in beds. CLB also design four 2,000-sf hotel units.
See Also: Luxury residential development completes in downtown Charleston
Related Stories
Digital Twin | May 24, 2021
Digital twin’s value propositions for the built environment, explained
Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.
Hotel Facilities | May 5, 2021
AC Hotel Fort Lauderdale Sawgrass Mills/Sunrise completes
Stantec designed the project.
Hotel Facilities | Apr 21, 2021
First newly constructed Signia by Hilton Hotel to be built in Atlanta
Signia by Hilton is a new upscale brand from Hilton Worldwide Holdings Inc.
AEC Tech | Mar 4, 2021
The Weekly show, March 4, 2021: Bringing AI to the masses, and Central Station Memphis hotel
This week on The Weekly show, BD+C editors speak with AEC industry leaders about the award-winning Central Station Memphis hotel reconstruction project, and how Autodesk aims to bring generative design and AI tools to the AEC masses.
Market Data | Feb 24, 2021
2021 won’t be a growth year for construction spending, says latest JLL forecast
Predicts second-half improvement toward normalization next year.
Hotel Facilities | Feb 16, 2021
Santa Monica Professional Building restored into a modern hotel
Howard Laks Architects designed the project.
Modular Building | Jan 26, 2021
Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks
iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.
Daylighting | Jan 16, 2021
Daylighting system creates 'an oasis in the city' for renovated hotel in downtown Minneapolis
Solatube daylighting systems were used to bring natural light into the lobby of the Midland Bank building in Minneapolis.
Giants 400 | Dec 16, 2020
Download a PDF of all 2020 Giants 400 Rankings
This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.