JE Dunn announced several changes in its Midwest Region executive leadership team. Dirk Schafer, executive vice president and chief operating officer with JE Dunn Construction, will succeed Dan Euston as president of JE Dunn Construction Company’s Midwest Region, effective immediately.
Euston will become president of Innovations 10.01 L.L.C., a JE Dunn start-up subsidiary. Innovations 10.01 develops and implements leading edge technology to improve the construction process and building life cycles. The company also utilizes proprietary products such as Site 10.01, a facility management solution that captures and combines pertinent construction data with building information modeling graphics generated during the building process. Site 10.01 is already successfully improving facility operations, reducing operating costs, and improving building efficiencies at Saint Luke’s Health System in Kansas City.
Euston has been with JE Dunn for 38 years and has been in charge of some of the company’s largest projects, including the Sprint World Headquarters Campus, H&R Block’s Headquarters, Kansas City Power and Light District, and the Nelson Atkins Museum’s Bloch Building. Dan currently serves on the boards of the Greater Kansas City Chamber of Commerce, Kansas City Area Development Council, and the Kansas City Builders Association. He is also co-chair of the American Heart Association’s Heart Walk.
Schafer has worked at JE Dunn for over 25 years and led the business operations of the Midwest Division, which produces over $1 billion in annual construction revenue. The JE Dunn Midwest region spans beyond the Kansas City metro area with offices in Des Moines, Omaha, Minneapolis, Springfield, Mo., and Topeka. Schafer is on the board of directors and is past board chairman at reStart homeless shelter. He currently serves as the Prairie Village Planning Commissioner, and serves on the Iowa State University Industry Advisory Council. At JE Dunn, Dirk has been the project executive on many landmark projects, including the National Nuclear Security Administration Campus, Kauffman Center for the Performing Arts, Federal Reserve Bank of Kansas City, and 2555 Grand. Over the years, Dirk has been dedicated to serving the local corporate development community and not-for-profit clients in the Kansas City area.
“During Dan Euston’s and Dirk Schafer’s tenure at JE Dunn, the company has grown from a few employees primarily in Kansas City, to a company with 20 offices and over 2,000 employees around the country. Their dedication and commitment to JE Dunn has directly impacted our company’s success over the past several decades,” said Terry Dunn, president and CEO of JE Dunn Construction Company.
Related Stories
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.