The United States Army Corps of Engineers, Tulsa District has selected JE Dunn Construction and Hoefer Wysocki Architects to design and build the new Sheppard Air Force Base Medical/Dental Clinic in Wichita Falls, Texas.
The $67.5 million, 170,000-sf clinic will support the 82nd Medical Group, which provides medical care for more than half of the Air Force’s annual throughput of Airman in Training. It will include a 900-sf ambulance shelter and a 10,000-sf joint Biological Agent Identification and Diagnostic System (JBaids) space. The project is designed to achieve LEED Silver certification and will be completed in 37 months.
Other members of the Building Team include ME Group (mechanical and electrical engineering services), Bob D. Campbell (SE), BHC Rhodes (CE), and Dimensional Innovations (signage).
Courtesy JE Dunn Construction.
Related Stories
Building Team Awards | Oct 20, 2020
Seamless speed to market drives Texas hospital’s growth
Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.
Healthcare Facilities | Oct 2, 2020
Healthcare Design Awards promote projects that heal
Awards program highlights trends in healthcare facility designs.
University Buildings | Sep 16, 2020
A new interprofessional hub opens on U. Minnesota’s campus
The Health Sciences Education Center includes two floors for simulation and immersive training.
Healthcare Facilities | Sep 16, 2020
New Foster + Partners-designed hospital begins construction in Cairo
The project focuses on natural light, greenery, and views of the outside.
Healthcare Facilities | Sep 10, 2020
Easing the oncology journey: The role of urgent care
Oncology patients are better served when they’re connected to the right staff.
Giants 400 | Aug 28, 2020
2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms
The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.
Healthcare Facilities | Aug 27, 2020
A hospital addition in Maryland was designed and built in 120 days
Lean practices, and early engagement with the county’s permitting department, moved this project forward quickly.
Building Team | Aug 21, 2020
A healthcare project in Wisconsin benefits from including MEP subs in early design discussions
Prefabrication played a major role in quickening construction.
Healthcare Facilities | Aug 13, 2020
New VA care center showcases the agency’s P3 approach to financing healthcare facilities
Clinic programming enhances patient privacy.
Healthcare Facilities | Aug 5, 2020
New Shenzhen Children’s Hospital will be covered in sky gardens
B+H Architects is designing the project.