Hill International, a global leader in managing construction risk, has announced that its joint venture with URS Corp. has received a blanket purchase agreement from the U.S. General Services Administration to provide construction management as agent services for the U.S. Department of State's Foreign Affairs Security Training Center (FASTC) project. The five-year agreement has an estimated value to the URS/Hill joint venture of approximately $21.8 million. URS is a 60% partner in the joint venture, and Hill is a 40% partner.
The FASTC project will establish a consolidated training center for training in a wide array of law enforcement and security disciplines within the U.S. Department of State for the protection of diplomats and U.S. embassies abroad. Diplomatic security training is currently conducted at up to 19 different, geographically separated, leased and contracted facilities nationwide. The new FASTC will be a state-of-the-art facility. It is expected to provide training for 8,000-10,000 students per year, including special agents, foreign service officers, selected foreign law enforcement and other personnel.
The URS/Hill joint venture will provide construction management services during the design, construction, and commissioning phases of the FASTC project.
"Hill is proud to be partnered with URS to manage construction of a facility that will help enhance the training of law enforcement officials and ultimately improve diplomat and embassy security," said James E. Koch, Ph.D., P.E., LEED AP, F.SAME, Senior Vice President and Director of Hill's Federal Services Group. +
Related Stories
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.