flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

July 2012: Product Solutions

July 2012: Product Solutions

Insulation, ceiling panels, sunshades.


By By Nicole Bowling, Associate Editor | July 13, 2012
This article first appeared in the July 2012 issue of BD+C.

Architectural-grade insulation is energy-efficient, moisture resistant

ACH Foam Technologies’ new EPS architectural-grade insulation, Foam-Control Plus+, can be used in a wide range of applications, such as perimeter insulation, under-slab insulation, cavity wall insulation, sheathing, precast concrete applications, green roofs, plaza decks, and waterproofing applications—especially where its moisture-resistant properties can be a benefit. ACH Foam provides Foam-Control Plus+ in 2x8-foot and 4x8-foot sheets up to 36 inches thick.

ACH Foam Technologies

 

[pagebreak]

Ceiling panels increase fire rating

Class-A fire-rated panels from WoodTrac are available in three finishes: Abbey Oak, Bank Alder, and White/Paintable. Panels can be installed in any 2x2-foot or 2x4-foot suspended ceiling. The manufacturer has provided three profiles of moldings: Tear Drop, Colonial, and Cove. Moldings can be installed over any 15/16-inch or one-inch-wide ceiling grid. Panels can be combined with any molding profile and molding finish to match the desired look. Class-A panels are made of 3/8-inch-thick fire-rated board laminated on both sides with high-definition micropaper.

WOODTRAC

 

[pagebreak]

Sunshades reduce solar heat, improve energy performance

Architectural sunshades from Gamco include pre-engineered louver blades, outrigger supports, and mounting brackets. The sunshade blades are offered in several standard and custom shapes, including tubular profiles. Fabricated from lightweight aluminum, the sunshade blades are available in anodized or a wide variety of painted finishes. Outriggers are available in standard depths of 24 and 30 inches, as well as custom sizes, in either stainless or painted steel to assure strength and durability. Gamco’s adaptable mounting bracket systems are used to securely anchor the sunshade outriggers to the building façade.

GAMCO Corp.

Related Stories

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021