flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.


By By BD+C Staff | July 20, 2012
The $29 million Lady Bird Johnson Middle School, in Irving, Texas, isat 152,000
The $29 million Lady Bird Johnson Middle School, in Irving, Texas, isat 152,000 sfthe largest net-zero energy public school in
This article first appeared in the July 2012 issue of BD+C.

School districts are demanding project-based learning environments that use a combination of extreme flexibility and the latest technology to support different styles of learning, says Daniel R. Mader, AIA, REFP, LEED AP, CEO of Fanning Howey.

“There’s a lot of pent-up need out there, but educational communities are waiting for more proof of a recovery,” says Mader. “There seems to be more optimism for being able to address capital needs in 2013.”

High on school districts’ list: energy-efficient design to lower O&M costs. +

 

 

TOP 25 K-12 SCHOOL SECTOR ARCHITECTURE FIRMS

Rank Company 2011 K-12 Revenue ($)
1 DLR Group 38,000,000
2 PBK 31,660,000
3 SHW Group 31,417,872
4 Fanning/Howey Associates 29,170,000
5 HMC Architects 25,407,316
6 LPA 20,630,363
7 Heery International 20,499,000
8 IBI Group 20,154,278
9 Perkins+Will 16,220,132
10 NAC|Architecture 15,340,409
11 Moseley Architects 15,230,000
12 NTD Architecture 14,377,522
13 Perkins Eastman 14,300,000
14 Tetra Tech Architects & Engineers 13,200,000
15 SMMA|Symmes Maini & McKee Associates 10,395,653
16 Corgan Associates 10,177,000
17 SEI Design Group 7,836,000
18 FGM Architects 7,691,587
19 Fletcher-Thompson 7,500,000
20 S/L/A/M Collaborative, The 6,710,914
21 Ashley McGraw Architects 6,460,000
22 DLA Architects 5,240,000
23 Harley Ellis Devereaux 4,800,000
24 LS3P Associates 4,541,486
25 CTA Architects Engineers 4,155,200

 

TOP 25 K-12 SCHOOL SECTOR ENGINEERING FIRMS

Rank Company 2011 K-12 Revenue ($)
1 URS Corp. 63,000,000
2 AECOM Technology Corp. 42,000,000
3 Jacobs 31,000,000
4 STV 24,338,000
5 Parsons Brinckerhoff 21,900,000
6 BRPH 12,000,000
7 TTG|TMAD Taylor & Gaines 11,521,550
8 Stantec 8,460,000
9 Dewberry 8,033,356
10 Shive-Hattery 7,807,781
11 KJWW Engineering Consultants 5,289,070
12 Birdsall Services Group 4,750,000
13 James Posey Associates 4,700,000
14 KCI Technologies 4,500,000
15 Aon Fire Protection Engineering 4,000,000
16 KPFF Consulting Engineers 4,000,000
17 L.R. Kimball 3,962,000
18 M/E Engineering 3,890,000
19 Thornton Tomasetti 3,229,836
20 Atkins North America 3,112,115
21 Coffman Engineers 3,000,000
22 AKF Group 2,800,000
23 Wiss, Janney, Elstner Associates 2,708,000
24 RDK Engineers 2,550,000
25 Middough 2,500,000

 

TOP 25 K-12 SCHOOL SECTOR CONSTRUCTION FIRMS

Rank Company 2011 K-12 Revenue ($)
1 Gilbane Building Co. 666,177,000
2 Balfour Beatty US 526,376,172
3 Turner Corporation, The 412,272,000
4 McCarthy Holdings 383,000,000
5 CORE Construction 232,866,651
6 Kraus-Anderson Construction 201,300,000
7 Consigli Construction 181,349,159
8 Hensel Phelps Construction 156,030,000
9 Suffolk Construction 148,781,095
10 Skanska USA 141,153,171
11 Flintco 130,000,000
12 McShane Companies, The 125,000,000
13 Barton Malow 121,621,680
14 JE Dunn Construction 101,004,174
15 Shawmut Design and Construction 98,300,000
16 Pepper Construction Group 95,019,000
17 C.W. Driver 93,913,000
18 Sundt Construction 80,095,300
19 PCL Construction Enterprises 75,876,100
20 Doster Construction 75,831,418
21 Tutor Perini Corp. 72,470,000
22 Bernards 70,500,000
23 Walbridge 70,500,000
24 Clark Group 69,011,298
25 S. M. Wilson & Co. 63,746,990

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021