flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Karolinska Institute’s new laboratory building

Laboratories

The Karolinska Institute’s new laboratory building

C.F. Møller Architects designed the building.


By David Malone, Associate Editor | April 1, 2019

Photo: Mark Hadden

Biomedicum, the new laboratory building at the Karolinska Institute in Stockholm, unifies the institute’s research environments under one roof.

The nearly 700,000-sf, 11-story facility will feature flexible laboratory and office space meant to be a catalyst for collaboration between the various research and study environments. It comprises four connected buildings with laboratories built around an eight-story high atrium wrapped in a transparent double-shell façade.

 

Photo: Mark Hadden.

 

The building, located within the campus park, also brings the park inside its walls with a glass-covered green atrium. The atrium roof is a suspended ceiling with large dome-shaped lanterns that let in daylight. Above is a fully glazed roof that is easy to maintain and can be reached from a suspended ceiling.

 

See Also: Former grocery store becomes a cancer care center in New Jersey

 

The transparent ground floor offers access to the atrium, a cafe, conference rooms, and a public exhibition space. The ground floor also forms new connections through the park to open up the Karolinska Institute towards both the city and the planned university hospital.

 

Photo: Mark Hadden.

 

Biomedicum accommodates 1,600 researchers and staff and house the following departments:

– The Department of Cell and Molecular Biology

– The Department of Physiology and Pharmacology

– The Department of Microbiology, Tumor and Cell Biology

– The Department of Medical Biochemistry and Biophysics

– The Department of Neuroscience

 

Photo: Mark Hadden.

 

Photo: Mark Hadden.

 

Photo: Nikolaj Jakobsen.

 

Photo: Mark Hadden.

Related Stories

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

Laboratories | Jun 24, 2020

CDC set to build the most advanced high containment laboratory in the country

Flad Architects, Page Southerland Page, and WSP will plan, program, and design the HCCL.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

Laboratories | May 21, 2019

Georgia Tech Research Institute adds 350,000 sf of specialized tech facilities

McCarthy Building Companies with Flad Architects acted as the design-build team.

Laboratories | Apr 23, 2019

Translational health science environments: 6 strategies for open innovation and knowledge transfer

Simply putting researchers and clinicians in the same building with hopes that serendipitous collaborations will ensue will often not yield the outcomes organizations seek.

Sustainable Design and Construction | Apr 9, 2019

One of the largest zero-carbon, net-zero buildings is rising in Spokane

Catalyst will be part of an innovation hub, with Eastern Washington University as its main tenant.

| Mar 21, 2019

Preserving Edison's "Corporate" R&D Lab in West Orange, N.J.

Report on Thomas Edison's West Orange, N.J., Laboratory.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021