Katerra, the Menlo Park. Calif.-based technology company that specializes in prefabricated construction services, is expanding that portfolio through its acquisition of UEB Builders and Fortune-Johnson General Contractors (F-J).
UEB is a GC that specializes in commercial and residential projects such as multifamily, student housing, mixed use, and institutional. UEB can now tap into Katerra’s sales network that includes 11 offices in the U.S. (three of which are in Arizona) and one in Guadalajara, Mexico.
“Katerra reflects what we both believe in,” says Michael Hurst, a Principal at UEB Builders. “A shared desire to find a better way to build for our partners and their communities.” Prior to this merger, UEB had worked with Katerra on a number of projects, including Union South Bay, a 357-unit midrise apartment development under-construction in Carson, Calif.
F-J, founded in 1991, focuses primarily on multifamily construction, but also engages a variety of building types including high-density mixed-use communities, garden-style apartments, senior living, and student housing.
F-J was awarded the 2018 Multi-Family Builder of the Year by the National Association of Home Builders.
Katerra did not disclose the terms of these acquisitions, nor provide specifics about how the businesses would be integrated into its operations, expect to note that through these partnerships, Katerra would gain further construction expertise that will allow the company to expand its geographical footprint across the United States.
“Both companies share Katerra’s commitment to delivering increased value to customers by embracing technology and innovative methods,” says Michael Marks, CEO and co-founder of Katerra.
And given that Katerra owns four architecture firms, it can now present itself to clients as a full-service provider of manufacturing, design, engineering, and construction.
Katerra is focused on speed-to-market construction through such tools as digital technology, offsite manufacturing, and fully integrated building teams. For example, a garden-style multifamily building might take 140 days to complete via conventional construction. In Las Vegas, Katerra initiated K90, an R&D project where it built a 24-unit garden apartment in 90 days, from framing to delivery, leaning heavily on modular and prefabrication for such repetitive areas as bathrooms.
To see a video about K90, click here.
UEB and F-J fall under the oversight of Paal Kibsgaard, who last month joined Katerra as its COO, a new position for the company. Kibsgaard had been chairman and CEO of Schlumberger Ltd., an oilfield services company. He has also served on Katerra’s board for three year.
Kibsgaard is now responsible for Katerra’s U.S. operations, including architecture, engineering, manufacturing, and construction. Kibsgaard is also responsible for international expansion, and the development of new construction technologies.
Related Stories
| Feb 26, 2014
Startup PocketCake aims to bring virtual reality simulations to the AEC masses
Founded in 2012, the development firm offers custom virtual reality simulations for the price of a typical architectural illustration.
| Feb 26, 2014
Billie Jean King National Tennis Center serving up three-phase expansion
The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium.
| Feb 24, 2014
First look: UC San Diego opens net-zero biological research lab
The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.
| Feb 21, 2014
Naturally ventilated hospital planned in Singapore
The Ng Teng Fong General Hospital will take advantage of the region's prevailing breezes to cool the spaces.
| Feb 21, 2014
Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project
Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain.
| Feb 19, 2014
Why you should start with a builder, part two
When it’s time to build or expand, the first step is finding a builder that fits your needs. Once you have found a builder, checked their references, visited with their previous clients and are ready to move forward, the next step is answering an initial set of questions that will direct your project.
| Feb 19, 2014
Obama Administration moves to boost fuel efficiency standards on heavy-duty vehicles
The Obama Administration wants to boost fuel efficiency of medium- and heavy-duty trucks for models made in 2019 and later.
| Feb 19, 2014
Slight rebound for Architecture Billings Index
After consecutive months of contracting demand for design services, AIA's Architecture Billings Index inched up nearly two points to 50.4 in January, indicating favorable business conditions.
| Feb 19, 2014
Harvard's 'termite robots' can build any thing, any way [video]
The robots build by observing thier environment and then obeying a set of traffic rules programmed by researchers.
| Feb 18, 2014
Illinois leads Top 10 states for LEED in annual USGBC ranking
The U.S. Green Building Council has released its ranking of the Top 10 States for LEED, the world’s most widely used and recognized green building rating system.