Katerra, the Menlo Park. Calif.-based technology company that specializes in prefabricated construction services, is expanding that portfolio through its acquisition of UEB Builders and Fortune-Johnson General Contractors (F-J).
UEB is a GC that specializes in commercial and residential projects such as multifamily, student housing, mixed use, and institutional. UEB can now tap into Katerra’s sales network that includes 11 offices in the U.S. (three of which are in Arizona) and one in Guadalajara, Mexico.
“Katerra reflects what we both believe in,” says Michael Hurst, a Principal at UEB Builders. “A shared desire to find a better way to build for our partners and their communities.” Prior to this merger, UEB had worked with Katerra on a number of projects, including Union South Bay, a 357-unit midrise apartment development under-construction in Carson, Calif.
F-J, founded in 1991, focuses primarily on multifamily construction, but also engages a variety of building types including high-density mixed-use communities, garden-style apartments, senior living, and student housing.
F-J was awarded the 2018 Multi-Family Builder of the Year by the National Association of Home Builders.
Katerra did not disclose the terms of these acquisitions, nor provide specifics about how the businesses would be integrated into its operations, expect to note that through these partnerships, Katerra would gain further construction expertise that will allow the company to expand its geographical footprint across the United States.
“Both companies share Katerra’s commitment to delivering increased value to customers by embracing technology and innovative methods,” says Michael Marks, CEO and co-founder of Katerra.
And given that Katerra owns four architecture firms, it can now present itself to clients as a full-service provider of manufacturing, design, engineering, and construction.
Katerra is focused on speed-to-market construction through such tools as digital technology, offsite manufacturing, and fully integrated building teams. For example, a garden-style multifamily building might take 140 days to complete via conventional construction. In Las Vegas, Katerra initiated K90, an R&D project where it built a 24-unit garden apartment in 90 days, from framing to delivery, leaning heavily on modular and prefabrication for such repetitive areas as bathrooms.
To see a video about K90, click here.
UEB and F-J fall under the oversight of Paal Kibsgaard, who last month joined Katerra as its COO, a new position for the company. Kibsgaard had been chairman and CEO of Schlumberger Ltd., an oilfield services company. He has also served on Katerra’s board for three year.
Kibsgaard is now responsible for Katerra’s U.S. operations, including architecture, engineering, manufacturing, and construction. Kibsgaard is also responsible for international expansion, and the development of new construction technologies.
Related Stories
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 10, 2013
Turner Construction honored by National Building Museum
Turner Construction Company announced that it has been selected as the National Building Museum’s 2013 Honor Awardee.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.
| Jun 7, 2013
First look: University of Utah's ‘teaching hospital for law’
The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
| Jun 7, 2013
First look: Austin breaks ground on 'light-filled' Central Library
The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.
| Jun 4, 2013
SOM research project examines viability of timber-framed skyscraper
In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.
| Jun 4, 2013
Notification reinvented: SimplexGrinnell introduces revolutionary family of intelligent notification appliances
Simplex TrueAlert ES uses addressable technology to improve protection, simplify installation and reduce operating costs.